MAC-PAC Homecontact ussupport login 
Documentation > MAC-PAC Technical Library > Manufacturing > Inventory Control > Programs > Order/Requirements Purge - Purpose > Order/Requirements Purge - Reports

Order/Requirements Purge - Reports

IC060E

Number

Description

Purpose

IC060B

Manufacturing Order/Requirements Delete

The Manufacturing Order/Requirements Delete Report lists all records physically deleted from the Manufacturing Order, Component Requirements, and Labor Requirements Files during execution of the Order/Requirements Purge program.  The report horizon date indicates the date specified by the user when the Order/Requirements Purge program was initiated.  The horizon date is the last date on which a record will be deleted.  A manufacturing order record is deleted if its date of last activity and close date are earlier than the user-defined horizon date.

IC060C

Sales Order Header/Line Delete

The Sales Order Header/Line Delete Report lists all records physically deleted from the Sales Order Header File and the Sales Order Line File during execution of the Order/Requirements Purge program.  The report horizon date indicates the date specified by the user when the Order/Requirements Purge program was initiated. It is the greatest date on which a record will be deleted.  A customer sales order will be deleted if the close date and date of last shipment are within the user-defined horizon date.

 

IC060E Program Menu