5:00 p.m.
|
1.
|
Issue a break message to all MAC-PAC users that they have 5 minutes to log out of the system.
|
5:05 p.m.
|
2.
|
Cancel all asynchronous monitors. Cancel the JIT Async Monitor with the JIT Night Cancel option to assure all transactions are processed before the monitor is canceled.
|
|
3.
|
Bring down all MAC-PAC users who are logged into the system.
|
5:15 p.m.
|
4.
|
Check for failed online transactions. Resolve any problems before proceeding (for example, a terminal loses power in the middle of a transaction).
|
|
5.
|
Back up master files.
|
|
6.
|
Change journal receiver.
|
|
7.
|
Display journal attributes.
|
|
8.
|
Delete old receiver.
|
|
9.
|
Start off-line processing.
|
|
|
a. Submit batch jobs (manufacturing/distribution)
|
|
|
b. Release batch jobs (financials)
|
|
10.
|
Check for failed off-line transactions. Resolve any problems before proceeding.
|
|
11.
|
Print out results of submitted jobs.
|
|
12.
|
Start asynchronous monitors.
|