Documentation >
MAC-PAC Technical Library >
Manufacturing >
Repetitive Supply >
Programs >
Schedule Transmission Request - Purpose
Schedule Transmission Request - Purpose
RS140E
The Schedule Transmission Request program (RS140E) allows you to select or display schedules (i.e., delivery conditions) for a particular planner. Two options are available:
1) Schedules requiring manual transmission may be selected. In this case, only schedules with a next transmission date less than or equal to today's date will be displayed.
2) All schedules may be displayed. In this case, all the schedules (regardless of the next transmission date and whether manual transmission is required) will be displayed for the specified planner.
Note that regardless of the option chosen, only summary schedules or schedules that have a transmission mode which uses paper output (as specified on Reference File category G53) will be loaded in the subfile.
Schedules which have already been selected for transmission (either firm, draft, or retransmit) will be displayed in red and cannot be maintained.