Master Schedule Batch Update/Report Requests - Purpose

MS310E

The Master Schedule Batch Update / Report Requests program (MS310E) allows the user to specify a planning period option and a planning method option on the report request screens.  When certain options are selected from the Master Scheduling Application Menu, a parameter is passed to the Program Status Field (PGMSTS) to indicate to the program which type of maintenance to perform.  Program control will be based on the parameter in this work field.  The specific options, parameters and types of processing are as follows:

MS310E Program Menu