Pending Engineering Changes - Purpose
Pending Engineering Changes - Purpose
DE520E
The Pending Engineering Changes program (DE520E) prints the Pending Product Change report (DE520), which lists the product structure records whose effectivity dates fall within the date parameters entered by the user in the Design Engineering Retrieval Request program (DE310E).
A maximum of 99 Pending Product Change Report Requests can be processed by this program. Any additional requests in the transaction file and any invalid requests are printed on the Pending Product Change Exception report (DE521).