MAC-PAC Homecontact ussupport login 
Documentation > MAC-PAC Technical Library > Manufacturing > Capacity Planning > Programs > CP Full LR-Generation Preparation - Purpose

CP Full LR-Generation Preparation - Purpose

CP085E

The CP Full LR-Generation Preparation program (CP085E) is processed if a full regeneration of labor requirements was requested on the Capacity Planning Labor Requirements Generation Request screen (CP080S01).  If the Shop Floor Control module is installed, this program flags only planned orders.  If the Shop Floor Control module is not installed, this program flags all planned and firmed orders.  Open orders are flagged if the Load Open Orders Option on the System Control file is set to yes.

All flagged orders will be processed the next time the Capacity Planning Labor Requirements Generation program is run.

CP085E Program Menu