JA520A
|
Job Cost - Detail
|
This report lists planned, actual, and projected costs for a job, as well as variances from planned costs. The quantities and unit costs on which these costs are based are also listed. The report can be requested for a specific job, a project manager, a job group, or all jobs.
Cost information is broken down by plant into the following cost categories: material, labor, overhead, miscellaneous costs, and additional job charges (listed on the report in that order). Material costs are further divided between job-controlled part costs and non job-controlled part costs; job-controlled part costs are broken down by inventory transaction. Labor, overhead, and miscellaneous costs are broken down by workcenter.
For more information about how the costs on this report are calculated, refer to the Key Concepts section of this manual, and the Job Cost Report program description in the Job Costing Program Documentation Manual.
|
JA520B
|
Job Cost - Summary and Plant Summary
|
This report lists planned, actual, and projected costs for a job. It also indicates variances between both actual and planned and projected and planned costs. These costs are further divided by plant into material, labor, overhead, miscellaneous costs, and additional job charges. If the Shop Floor Module is installed, a percent complete will be calculated and printed at the bottom of the report. The report can be requested for a specific job, a project manager, a job group, or all jobs.
A summary report for each job across all plants is also generated.
|