Configuration Cost Rollup and Regeneration - Calculations

EC180E

A.   Housekeeping

1.   Parameter lists and key lists are defined.

2.   Work fields are defined and program constants are initialized.

3.   Retrieve Reference File data.

a.   Entity Name is retrieved from Reference File category 002.

b.   CPF File Access Status Codes are retrieved from Reference File category 015.

c.   Data Format is retrieved from Reference File category 049.  If no record is found, the date format is defaulted to MM/DD/YY.  Date and time is saved for a generation run time stamp.

e.   The Applications Installed are retrieved from Reference File category 012.

f.    The Installation Defaults are retrieved from Reference File category 133.

4.   Plant/Warehouse data is loaded from the Warehouse Description file (IC170M).

B.   Mainline

1.   If the program is called from the Manufacturing Configuration program (EC200E) -- PMODE equals 'EC200E' -- execute cost generation.

a.   Route the report to the output queue on the Configuration Cost Regeneration Request file (EC320AP).

b.   Write the transaction control headings to the report (EC180A).

c.   Perform the configuration cost regeneration.

(1)  Save the Order Number (SPONO), Release Number (SFRLNO), Line Number (SPLNNO), and Sequence Number (SPSEQN) for the last sales order option.

(2)  Retrieve the part information from the Part Master file (DE100M).

(3)  If the part is configured costed (PMCFCO equals '3' or '4') set the update configuration Flag (UPDCFG) to yes.

(4)  Retrieve the Manufacturing Order from the Manufacturing Order by M.O. Number file (IC100ML1).

(5)  Retrieve the Configuration Code record from the Configuration Code file (EC140M) and calculate the configuration costs for the configured part on the option record.

(a)  Set the Average Order Quantity (AVORQT) equal to the Manufacturing Order Quantity if the Allow New Cost Flag (CCALWC) is yes or if the part is not configured costed.

(b)  Set the Average Order Quantity equal to the Accounting Order Quantity (CCSADQ) from the Configuration Code file (EC140M) if the part is configuration costed but the Allow New Cost Flag (CCALWC) is no.

(c)  Retrieve the costs for each component in the Manufacturing Order as follows:

If the component part is configuration costed retrieve the configured costs from the Configuration Code file (EC140M).  If the record is not found in the file, retrieve its costs from the Part Master file (DE100M).

If the component is not configuration costed look it up in the array of non-configured costed parts.  If it is found, use the cost already calculated for it.  If it is not found, used the standard cost from the array.

Total Cost

equals

Retrieved Cost

times

Order Quantity

divided by

Scrap Factor

(d)  Add the component costs to total material cost if the component is consumed.  Subtract the component costs from the total material cost if the component is produced.

(e)  Retrieve the part's routing from the Routing file (ME120M).

(f)   Retrieve the part's workcenter from the Workcenter file (ME100M).

(g)  Calculate the labor and overhead costs for each record on the Labor Requirements file (IC125M) for the Manufacturing Order.

 

Fixed Time Calculations:


# of Batches



equals

 


Average Order Quantity



minus

 

Sensitivity. Factor
----------
100



times


Batch Quantity

 

 


divided by


Batch Quantity

(h)  Use the Number of Batches to inflate the Labor Hours and Machine Hours.

Fixed Time Labor Hours

equals

Fixed Time Labor Hours

times

Number of Batches

Fixed Time Labor Hours

equals

Fixed Time Labor Hours

times

Number of Batches

Labor Paced Operations:

Labor Cost

equals

Fixed-Time Labor Hours

times

Labor Rate

Overhead Cost

equals

Fixed-Time Labor Hours

times

Labor Overhead Rate

Machine Paced Operations:

Labor Cost

equals

Fixed-Time Labor Hours

times

Labor Rate

 

Overhead Cost

equals

 

Fixed-Time Labor Hours

times

Labor Overhead Rate

 

plus

 

 

Fixed-Time Machine Hours

times

Machine Based Rate

 

 

 

                               

The resulting Labor and Overhead Costs are then divided by the Average Order Quantity.

Labor Cost

equals

Labor Cost

Divided by

Average Order Quantity

Overhead Cost

equals

Overhead Cost

Divided by

Average Order Quantity


Variable Time Calculations:

Variable, Non-Crew, Labor Paced Operations:  (Piece Rate in Hours per Piece)

Labor Cost

equals

Piece Rate

times

Labor Rate

Overhead Cost

equals

Piece Rate

times

Labor Overhead Rate

Variable, Crew, Labor Paced Operations:  (Piece Rate in Hours per Piece)

Labor Cost

equals

Piece Rate

times

Number of Persons

times

Labor Rate

Overhead Cost

equals

Piece Rate

times

Number of Persons

times

Labor Overhead Rate

Variable, Machine Paced Operations:  (Piece Rate in Hours per Piece)

Labor Cost

equals

# of Persons

times

Labor Rate

times

Piece Rate

Divided by

# of Machines

Overhead Cost

equals

 

Piece Rate

times

Machine Based Rate

 

plus

 

 

 

Number of Persons

divided by

Number of Machines

times

Piece Rate

times

Labor Overhead Rate

 

 

                                             

 

Miscellaneous Cost Workcenter (900 level or greater)

Fixed Material Cost per Order Workcenter

Miscellaneous Material Cost


equals

Workcenter Miscellaneous Cost

divided by

Average Order Quantity

Fixed Labor Cost per Order Workcenter

Miscellaneous Labor Cost

equals

Workcenter Miscellaneous Cost

divided by

Average Order Quantity

Fixed Overhead Cost per Order Workcenter

Miscellaneous Overhead Cost

equals

Workcenter Miscellaneous Cost

divided by

Average Order Quantity

Variable Material Cost per Unit Workcenter

Miscellaneous Material Cost

equals

Workcenter Miscellaneous Cost

Variable Labor Cost per Unit

Miscellaneous Labor Cost

equals

Workcenter Miscellaneous Cost

Variable Overhead Cost per Unit

Miscellaneous Overhead Cost

equals

Workcenter Miscellaneous Cost

(i)   Accumulate the calculated costs in the appropriate costing buckets.

(j)   Accumulate the costs in the Total Cost field.  If the total costs is less than zero set it to zero and send and error message indication that the produced components cost more than the cost of producing the manufacturing order.

If this is a regeneration and the costs were calculated on the same day as the regeneration and those two costs are not the same, mark this condition as an exception to be printed on the exception report.

(k)  Update the Configuration Code file (EC140M) if the configured part is configured costed and the Allow New Cost Field is Yes.  If the Allow New Cost Field is No, flag that the costs are frozen.

(l)   If the part is not configured costed, update the array for the part with the calculated cost.

(7)  Write an exception record if the Manufacturing Order is not found.

(8)  Write the detail lines of the report.

(9)  Write the exception lines if any exist.

(10) Update the Configuration Code in the distribution warehouse on the Configuration Code file (EC140M) with the calculated amounts if the sales order is sourced out of a distribution warehouse and the configuration code on the sales order line matches the one on the manufacturing order.

(11) If the configuration code on the sales order line does not match that on the manufacturing order, retrieve the costs from the Configuration Code file (EC140M) and use them for the final cost.

(12) Write the final detail lines.

(13) Rollback all changes if an error is encountered.

(14) Write an exception record if no records are found.

2.   If the program is running a batch regeneration, retrieve the first record in the Configuration Cost Regeneration Request file (EC320AP).

a.   Set the lower limit on the Sales Order Line Item file (OP100M2) if the program is running a full regeneration.

(1)  Process the sales order lines if the configuration code is not equal to blanks.

(2)  Route the report to the output queue on the Configuration Cost Regeneration Request file (EC320AP).

(3)  Write the report headings.

(4)  Perform the configuration cost generation.  See 1. c. (1) through 1. c. (14) previously in this program for a detailed description of these calculations.

b.   Use the sales order if the program is running a regeneration for a specific sales order.

(1)  Route the report to the output queue on the Configuration Cost Regeneration Request file (EC320AP).

(2)  Write the report headings.

(3)  Perform the configuration cost generation.  See 1. c. (1) through 1. c. (14) previously in this program for a detailed description of these calculations.

3.   Delete the report request record from the Configuration Cost Regeneration Request file (EC320AP) once it has been processed.

4.   Write the ENE OF REPORT line and close the Configuration Cost Generation/Regeneration Printer file (EC180PF1).

5.   Format the Total Cost field (ORDCST) that will be passed to the Manufacturing Configuration program (EC200E).