WILLIAMS PLT BEL MASTER SCHEDULING 2/02/93
DSP01 MASTER SCHEDULE GENERATION REQUEST REVIEW
Full or Selective Generation (F/S) S
Planner Code P
Part Number
Starting Date 020293
Horizon Date 010594
Print Report (Y/N) Y
Planning Period Option 1
Planning Period Options: 1. Calendar Weeks
2. Calendar Months
3. Calendar Periods
F3=Exit F5=Previous F6=Next F9=Enter Mode
F14=Delete F21=New Ref ID
This screen is used to review the Tentative Master Schedule Generation report requests.
PLANT
Display only. Used to identify the plant for which master schedule generation will be done.
FULL OR SELECTIVE GENERATION (F/S)
Display only. Valid Values are:
F - Full Generation. All master scheduled parts will be evaluated during the generation process.
S - Selective Generation. The generation process will evaluate selected master scheduled parts, based upon the values you enter for Planner Code and Part Number.
PLANNER CODE
Display only. A selective generation may be requested.
PART NUMBER
Display only. A selective generation may be requested.
STARTING DATE
Display only. The starting date for which the tentative master schedule will be generated. Not before the current date.
HORIZON DATE
Display only. The ending date for which the tentative master schedule will be generated.
PRINT MS ACTION REPORT (Y/N)
Display only. If 'Y' is entered, the Tentative Master Schedule Report will be printed, detailing the generated schedule. If 'N' is selected, the report will not be printed.
PLANNING PERIOD OPTION
Display only. Valid values are:
1 - Calendar weeks
2 - Calendar months
3 - Calendar periods
To obtain detailed information, type 'X' and press F11.
COMMAND KEYS
F3 - Exit to menu.
F5 - Display previous transaction.
F6 - Display next transaction.
F9 - Return to the screen from which you requested the transaction review.
F11 - Retrieves detailed information about the planning period option.
F14 - Delete this transaction.
F21 - New Reference ID.
|