WILLIAMS   PLT BEL            MASTER SCHEDULING                        2/02/93

 DSP01                 MASTER SCHEDULE GENERATION REQUEST                REVIEW

                                                                               

                    Full or Selective Generation (F/S)   S                     

                                                                               

                    Planner Code                         P                     

                                                                                

                    Part Number                                                

                                                                               

                    Starting Date                        020293                

                                                                               

                    Horizon Date                         010594                

                                                                                

                    Print Report (Y/N)                   Y                     

                                                                               

                    Planning Period Option               1                     

                                                                               

                    Planning Period Options:  1. Calendar Weeks                

                                              2. Calendar Months               

                                              3. Calendar Periods              

                                                                               

 F3=Exit             F5=Previous         F6=Next             F9=Enter Mode     

 F14=Delete          F21=New Ref ID                                            

 

 

This screen is used to review the Tentative Master Schedule Generation report requests.

PLANT

Display only.  Used to identify the plant for which master schedule generation will be done.

FULL OR SELECTIVE GENERATION (F/S)

Display only.  Valid Values are:

F - Full Generation.  All master scheduled parts will be evaluated during the generation process.

S - Selective Generation.  The generation process will evaluate selected master scheduled parts, based upon the values you enter for Planner Code and Part Number.

PLANNER CODE

Display only.  A selective generation may be requested.

PART NUMBER

Display only.  A selective generation may be requested.

STARTING DATE

Display only.  The starting date for which the tentative master schedule will be generated.  Not before the current date.

HORIZON DATE

Display only.  The ending date for which the tentative master schedule will be generated.

PRINT MS ACTION REPORT (Y/N)

Display only.  If 'Y' is entered, the Tentative Master Schedule Report will be printed, detailing the generated schedule.  If 'N' is selected, the report will not be printed.

PLANNING PERIOD OPTION

Display only.  Valid values are:

1 - Calendar weeks

2 - Calendar months

3 - Calendar periods

To obtain detailed information, type 'X' and press F11.

COMMAND KEYS

F3   - Exit to menu.

F5   - Display previous transaction.

F6   - Display next transaction.

F9   - Return to the screen from which you requested the transaction review.

F11  - Retrieves detailed information about the planning period option.

F14  - Delete this transaction.