WILLIAMS PLT BEL MASTER SCHEDULING 2/10/92
DSP01 MASTER SCHEDULE GENERATION REQUEST DETAIL
Full or Selective Generation (F/S) F
Planner Code
Part Number BOLT-100
Starting Date 021092
Horizon Date 061592
Print Report (Y/N) Y
Planning Period Option 1
Planning Period Options: 1. Calendar Weeks
2. Calendar Months
3. Calendar Periods
F2=Command F3=Exit F4=Prompt F9=Review
F15=Rekey Data F16=Change Printer F17=New Plant
This screen allows you to request the Tentative Master Schedule Generation. This process generates a suggested schedule for standard master scheduled parts. The generation may be performed for all parts, for all parts planned by a selected planned, or for individually selected parts. Schedules generated through this option may subsequently be reviewed or modified through the maintenance option.
PLANT
Display only. Used to identify the plant for which master schedule generation will be done. Plant must be valid (not blanks or nines) and the user must be authorized to the manufacturing company/warehouse associated with the plant (Reference File category 409). Defaults to the plant assigned to the user ID, but may be changed by pressing F17.
FULL OR SELECTIVE GENERATION (F/S)
Required. Valid Values are:
F - Full Generation. All standard master scheduled parts will be evaluated during the generation process.
S - Selective Generation. The generation process will evaluate selected standard master scheduled parts based upon the values you enter for Planner Code and Part Number.
PLANNER CODE
Optional. If a selective generation is requested, you may specify a particular planner.
PART NUMBER
Optional. If a selective generation is requested, you may request scheduling for a specific part. It must be a standard master scheduled part and not a daily master scheduled, requirements planning, or service part.
STARTING DATE
Required. The starting date for which the tentative master schedule will be maintained. Must not be before the current date.
HORIZON DATE
Required. The ending date for which the tentative master schedule will be maintained.
PRINT MS ACTION REPORT (Y/N)
Required. If 'Y' is entered, the Tentative Master Schedule Report will be printed, detailing the generated schedule. If 'N' is selected, the report will not be printed.
PLANNING PERIOD OPTION
Required. Valid values are:
1 - Calendar weeks
2 - Calendar months
3 - Calendar periods
COMMAND KEYS
Enter - Request the Tentative MS Generation.
F2 - Display a window where a fast path option or mnemonic can be entered. Fast path allows the next menu selection to be made directly from this screen. When the window is displayed, pressing F3 will remove it.
F3 - Exit with update.
F4 - Display a list of values for the field where the cursor is positioned. If you select one of the items from the list, it will be returned to the application screen.
F9 - Enter the Transaction Review program to review and delete report requests.
F15 - Rekey the entered data.
F16 - Allows the user change the output location.
F17 - Used to change the plant in which the user is currently working.
|