MAC-PAC Homecontact ussupport login 
Documentation > MAC-PAC Reference Library > Manufacturing > Master Scheduling > Screens > Projected Demand > MS150S03 - Detail

MS150S03 - Detail

 

 

WILLIAMS   CO  001            MASTER SCHEDULING                        5/31/94

 DSP01      WHS BEL       PROJECTED DEMAND MAINTENANCE                   DETAIL

                                                                                

    Part Number      BICYCLE                     Part Type         MFG         

    Part Description CHILDREN'S TRICYCLE         Demand Code       D           

    Demand Type      EXPORT DEMAND               Demand Fence       6/07/94    

    Customer Ref No                                                            

                                                                               

                Week              Demand              Shipped                  

              Starting           Quantity             Quantity                 

               5/30/94               20.000                 .000               

               6/06/94               21.000                 .000               

               6/13/94               22.000                 .000               

               6/20/94               23.000                 .000               

               6/27/94               24.000                 .000                

               7/04/94               25.000                 .000               

               7/11/94               26.000                 .000               

               7/18/94               27.000                 .000               

               7/25/94               28.000                 .000               

               8/01/94               29.000                 .000              +

                                                                               

 F2=Command          F3=Exit             F9=Inquiry          F10=Select        

                                                                               

 MPW0522 The actual demand time fence has been reached                                                                                                         

 

 

This screen is used to enter a projected demand quantity for each period.

Once you have typed in all data, press the Enter key.  The quantities you entered will be validated.  Demand Quantity must be greater than Shipped Quantity for each period.  If all quantities are valid, the Projected Demand File (MS150M) will be updated asynchronously.  A message will be displayed when the update process is completed.

COMPANY/WAREHOUSE

Display only.  The company/warehouse for in which the demand for the specified part will be projected.  You entered the company/warehouse on the Function Select screen.

PART NUMBER

Display only.  The number of the part for which the demand will be projected.  You entered the part number on the Function Select screen.

PART TYPE

Display only.  The type of the part for which you wish to project demand.  The standard part types are:

PUR - Purchased Part

MFG - Manufactured Part

RAW - Raw Material

PLN - Planning Part

REF - Reference Part

B/T - Build-Thru Part

N/S - Non-Standard Part

TRN - Transfer Part

NSK - Non-Stock Part

DESCRIPTION

Display only.  The description as the part as retrieved from the Part Master File (DE100M).

DEMAND CODE

Display only.  The demand code associated with the part being processed.  Possible values are:

M - Standard Master Scheduled Part

R - Requirements Planning Part

S - Service Part

D - Daily Master Scheduled Part

DEMAND TYPE

Display only.  The description retrieved from Reference File category 463 for the demand type code that you entered on the Function Select screen.

DEMAND FENCE

Display only.  Projected demand before this date will not be included in netting logic for standard master scheduled parts in Master Scheduling, and for daily master scheduled parts, requirements planning parts, and service parts in the Requirements Planning Generation.  For standard or daily master scheduled parts, this date is calculated using the standard or daily demand fence fields on Reference File category 464.  For requirements planning or service parts, this date is calculated using the actual demand window specified on Reference File category D85.

CUSTOMER REFERENCE NUMBER

Display only.  The customer reference number entered on the function select screen.

PERIOD, MONTH, WEEK, OR DATE STARTING

Display only.  The first date in the planning period.

DEMAND QUANTITY

Optional.  Projected demand, or forecast, for the period.  The projected demand quantity should be defined in the stockkeeping unit of measure.  This demand will be "netted" against the consumable demand for the part, such as sales order and transfer order lines.

SHIPPED QUANTITY

Display only.  This is the amount shipped from electronic data interchange batch forecast shipments.  If you are not using electronic data interchange, this field will not be updated.

COMMAND KEYS

Enter - Update changes.

F2    - Display a window where a fast path option or mnemonic can be entered.  Fast path allows the next menu selection to be made directly from this screen.  When the window is displayed, pressing F3 will remove it.

F3    - Exit program without update.

F9    - Enter the Projected Demand Inquiry without updating changes.

F10   - Return to Function Select screen without updating changes.