MS800S02 - Summary

 

 

WILLIAMS                      KEY FACILITY LOAD                        6/21/94

 DSP01                   Planned Routing Date :  3/28/94                SUMMARY

 Key Facility       KF1   Period :   1/10/94 - 12/31/94          CALENDAR WEEKS

 Load Units   5                                              TENTATIVE SCHEDULE

                                                                               

                 ---------------- LOAD BY PART/CUMULATIVE LOAD ----------------

 Part Number        01/10/94        01/17/94        01/24/94        01/31/94   

 BOLT-100                  .000            .000        5000.000      116050.000

 SERVICE PART              .000            .000            .000            .000

                                                                               

                                                                               

                                                                               

                                                                                

                                                                               

                                                                               

                                                                               

                                                                               

 Total                     .000            .000        5000.000      116050.000

 Capacity                40.000          40.000          40.000          40.000

 Percentage Load           .00             .00          999.99          999.99 

                                                                               

                     F6=Next Screen      F7=Plan Act Review  F9=Maintenance    

 F11=Order Detail    F12=Fold/Truncate   F13=Simul Maint     F24=More Keys     

 MPW0084 Key facility capacity exceeded                                        

 

 

This screen displays, for a specified key facility, the load for each part and the cumulative load for four periods at a time.  The current, simulated, or tentative schedule is displayed, depending on the schedule option chosen on the Function Select screen.

PLANNED ROUTING DATE

Display only.  The date that the planned routings were last generated.  The planned routings need not be regenerated unless product design or key facility definition has changed.

KEY FACILITY

Display only.  The key facility number for which load is displayed.

PERIOD

Display only.  The start and end dates for which load is displayed.  If no calendar code was entered, the calendar code on the plant is used for calculating and displaying load.

LOAD UNITS

Display only.  If the load for this key facility will be determined from information in the Routing File (using Planned Routing Generation), then the load units is HOURS.  If the load will be determined using a resource profile, the load units correspond to the load being measured in the resource profile.

PART NUMBER

Display only.  The items contributing load to the key facility for the displayed periods.  By pressing F12, you can display/hide an additional line in which plant information is displayed.  The Plant field indicates where the part is defined that is causing load on the key facility.

LOAD BY PART

Display only.  This is the load on the key facility, in load units, created by manufacturing orders, sales orders, forecast, or tentative schedule for the part.  Which of the above list is used to generate the load for this part depends on the selected schedule option and on the demand type of the part.  For more details on the calculation of load, see the key concept in the Master Scheduling User Manual.

CUMULATIVE LOAD

Display only.  This is the cumulative load for all parts already listed.

TOTAL

Display only.  This field indicates the total load on the key facility for each period.

CAPACITY

Display only.  This is the effective capacity, in hours, for the key facility for each of the periods displayed.  The amount is derived by calculating the length of the period, the weekly capacity, and the capacity profile (daily percentages that are defined in the Key Facility Master File (MS100M).

PERCENTAGE LOAD

Display only.  This field indicates the percentage of load over the capacity of the key facility during the period defined.  This percentage takes into account the load imposed by configured, rework manufacturing orders.

COMMAND KEYS

Enter - Display the Function Select screen.

F2    - Display a window where a fast path option or mnemonic can be entered.  Fast path allows the next menu selection to be made directly from this screen.  When the window is displayed, pressing F3 will remove it.

F3    - Exit program and return to menu.

F4    - If you place the cursor in the subfile and press F4, the planning window (PLNS01) will appear.

F5    - Display the previous four periods.

F6    - Display the next four periods.

F7    - Access the Planning Action Review screen (RP810S01).

F9    - Access the Key Facility Maintenance Change screen (MS100S02).

F10   - Return to the Function Select screen.

F11   - This function key displays the Key Facility Load Detail screen (MS800S04).  To display this screen, place the cursor in the Load by Part/Cumulative Load subfile and press F11.

F12   - Display a second line of information for each record.  The second line contains the plant that the part belongs to and the cumulative load for the periods.  When the second line is displayed, pressing F12 again will remove it.

F13   - Display the Simulation Schedule Maintenance Function Select screen (RP140S01).

F16   - Display the Key Facility Information screen (KFS01).

F24   - Display additional command keys that are valid for the current screen.