MAC-PAC Homecontact ussupport login 
Documentation > MAC-PAC Reference Library > Manufacturing > Master Scheduling > Screens > Available To Promise > MS830S03 - Demand Detail

MS830S03 - Demand Detail

 

 

WILLIAMS   PLT BEL            MASTER SCHEDULING                        5/31/94

 DSP01                   AVAILABLE TO PROMISE INQUIRY                    DETAIL

                                                                               

 BOLT-100         1" BOLT                     Planning Bal      108,040.000    

 Planner          ANDREW BLANE                Consumption Code            0    

                                              Demand Fence          6/07/94    

                        Over Due      5/30/94        6/06/94        6/13/94    

 Consumed Demand            .000           .000           .000           .000  

 Total Demand            214.000           .000         81.000         22.000  

 Current Schedule     111362.000           .000           .000           .000  

 Projected Avail      219188.000     219188.000     219107.000     219085.000  

 Avail to Promise     219188.000           .000         60.000-          .000  

 Cum Avail to Prom    219188.000     219188.000     219128.000     219128.000  

                                                                               

                        6/20/94       6/27/94        0/00/00        0/00/00    

 Consumed Demand            .000           .000           .000           .000  

 Total Demand             23.000         24.000           .000           .000  

 Current Schedule           .000           .000           .000           .000  

 Projected Avail      219062.000     219038.000           .000           .000  

 Avail to Promise           .000           .000           .000           .000  

 Cum Avail to Prom    219128.000     219128.000           .000           .000  

                                                                               

 F2=Command          F3=Exit             F12=Demand Detail   F24=More Keys     

 

 

 

This screen displays either the available to promise information or the total demand information for the part entered on the Function Select screen.  The planning period option chosen on the Function Select screen determines how the data is grouped on the screen.  Quantities are expressed in the stockkeeping unit of measure.  All fields are display only.

PLANT

Display only.  Information is displayed based on supply and demand within this plant.

PART NUMBER/PART DESCRIPTION

Display only.  These fields identify the item whose demand information is displayed; they were entered on the Function Select screen.

PLANNING BALANCE

Display only.  This is the beginning inventory that is available for planning.  This total is calculated as follows:

On-hand inventory

Plus     Inventory at the manufacturing warehouse that is available for planning

Plus     Work in process

Plus     Distribution inventory at any distribution warehouse associated with the plant where the Available for Planning flag (on the Warehouse Description File) is Yes.

Minus    Inventory reserved for customer orders (if any inventory balances are available for both planning and distribution but the Sales Order Planning flag on the Warehouse Description File indicates that sales orders sourced from distribution inventory are not included in demand calculations).

If the part is potency controlled, the quantity in this field is displayed in reverse image and reflects the planning balance in terms of potent units.  Potent units are calculated as follows:

SKU for each balance type on each part/lot/location multiple location record

Multiplied by  The actual potency on the lot control master record for the part/lot

Divided by     The standard potency percentage on the Part Master record for the plant

PLANNER

Display only.  The person responsible for this part.

CONSUMPTION CODE

Display only.  This information indicates the types of demand that will be consumed or netted against forecast.  Valid values are:

0 - No consumption

1 - Sales Orders/Transfer Orders/Transfer Requisitions/Synchro Offset Releases only

2 - Component Requirements/Flow Requirements only

3 - All requirements listed in options 1 and 2

DEMAND FENCE

Display only.  A user-definable period of time.  During this period, Master Scheduling will take into account consumable demand (rather than projected demand) for scheduling.  After this period, MS again looks at projected demand when calculating the schedule.

AMOUNT OVERDUE/DATE RANGE

Display only.  The period for which the data is displayed.

The same screen area displays either Consumed Demand (for the Available to Promise Inquiry) or Projected Demand (for the Total Demand Inquiry).

CONSUMED DEMAND

Display only.  Depending on the value of the Consumption Code, which is found on the Part Master File, this field represents the total of consumed demand.

CONSUMPTION CODE                    VALUE

0                                                                         No consumption

1                                                                         Planned Sales Orders, Transfer Orders, Transfer                                             Requisitions, and Synchro Offset Releases

Planned sales orders, transfer orders, and transfer requisitions are those that are considered to satisfy projected demand (forecast).  They are entered with a Planned/Unplanned Code of 'P' through the corresponding maintenance conversations.  (Synchro delivery requests are always planned).  Sales orders are only included in this quantity if they will be relieved from manufacturing inventory or if they will be relieved from distribution inventory at the manufacturing warehouse and the Sales Order Planning flag (on the Warehouse Description File) for this manufacturing warehouse is Yes.

2                                                                         Component Requirements and Flow Requirements

3                                                                         All Requirements listed for codes 1 and 2

PROJECTED DEMAND

Display only.  The forecasted quantity for the period entered through the Projected Demand Maintenance conversation.

The same screen area displays either Total Demand (for the Available to Promise Inquiry) or Consumed Demand (for the Total Demand Inquiry).

TOTAL DEMAND

Display only.  Net demand plus unplanned customer orders, unconsumed demand, and EDI demand (if EDI is used).

CONSUMED DEMAND

Display only.  Depending on the value of the Consumption Code, which is found on the Part Master File, this field represents the total of consumed demand.

CONSUMPTION CODE                    VALUE

0                                                                         No consumption

1                                                                         Planned Sales Orders, Transfer Orders, Transfer
                                                                     Requisitions, and Synchro Offset Releases

Planned sales orders, transfer orders, and transfer requisitions are those that are considered to satisfy projected demand (forecast).  They are entered with a Planned/Unplanned Code of 'P' through the corresponding maintenance conversations.  (Synchro delivery requests are always planned).  Sales orders are only included in this quantity if they will be relieved from manufacturing inventory or if they will be relieved from distribution inventory at the manufacturing warehouse and the Sales Order Planning flag (on the Warehouse Description File) for this manufacturing warehouse is Yes.

2                                                                         Component Requirements and Flow Requirements

3                                                                         All Requirements listed for codes 1 and 2 The same
                                                                     screen area displays either Current Schedule (for the
                                                                     Available to Promise Inquiry) or Net Demand (for the
                                                                     Total Demand Inquiry).

CURRENT SCHEDULE

Display only.  The amount currently planned for production during the period.

NET DEMAND

Display only.  The greater of Projected Demand and Consumed Demand.

The same screen area contains either Projected Available (for the Available to Promise Inquiry) or Unplanned Customer Orders (for the Total Demand Inquiry).

PROJECTED AVAILABLE

Display only.  The quantity remaining after netting the total demand against the scheduled quantity, including any projected available from the previous period.

UNPLANNED CUSTOMER ORDERS

Display only.  Unplanned sales orders, transfer orders, and transfer requisitions with a promise date that falls within the week.  Unplanned sales orders, transfer orders, and transfer requisitions are unexpected orders that were not taken into account when developing the demand projection.  They are entered with a Planned/Unplanned Code of 'U' through the corresponding maintenance conversations.

The same screen area displays either Available to Promise (for the Available to Promise Inquiry) or Unconsumed Demand (for the Total Demand Inquiry).

AVAILABLE TO PROMISE

Display only.  The quantity remaining after actual demand is netted against the scheduled quantity.

UNCONSUMED DEMAND

Display only.  This field represents the total of unconsumed demand depending on the Consumption Code, which is found on the Part Master File.

CONSUMPTION CODE                      VALUE

0                                                                         All requirements listed for Consumption Codes 1 and 2

1                                                                         Component Requirements and Flow Requirements

2                                                                         Planned Sales Orders, Transfer Orders, Transfer
                                                                     Requisitions, and Synchro Offset Releases

3                                                                         No Requirements (All requirements in Consumption
                                                                     Codes 1 and 2 are consumed.)

The same screen area displays either Cumulative Available to Promise (for the Available to Promise Inquiry) or EDI Demand (for the Total Demand Inquiry).

CUMULATIVE AVAILABLE TO PROMISE

Display only.  The total to date of the available quantity remaining after consumed demand is netted against the scheduled quantity.

EDI DEMAND

Display only.  The total quantity from demand passed from the Future Three interface.

TOTAL DEMAND

Display only.  The total of demand from all sources.  Calculated as: Net Demand + Unplanned Orders + Unconsumed Demand + EDI Demand (if Future Three is installed)

COMMAND KEYS

Enter - Return to the menu.

F2    - Display a window where a fast path option or mnemonic can be entered.  Fast path allows the next menu selection to be made directly from this screen.  When the window is displayed, pressing F3 will remove it.

F3    - Exit program and return to menu.

F9    - Display the Sales Order Detail screen.

F11   - Display the Transfer Order Detail screen.

F12   - (For Available to Promise Inquiry) Display the Total Demand Inquiry screen.

F12   - (For Total Demand Inquiry) Display the Available to Promise Detail screen for the selected part.

F24   - Display additional command keys that are valid for the current screen.