Documentation >
MAC-PAC Reference Library >
Manufacturing >
Master Scheduling >
Reports >
Multi-Level Forecast Generation Report
Multi-Level Forecast Generation Report
MS130
DATE 5/31/94 MANUFACTURING SITE 1 PAGE 1
TIME 9:38:31 PLANT BEL
REPORT MS-130 REQUESTOR WILLIAMS
MULTI-LEVEL FORECAST GENERATION REPORT
PARTS PROCESSED
PART NUMBER DEMAND TYPE CUSTOMER REFERENCE
--------------- ----------- ------------------
MSD0MFGJIT00001 E
MSD0MFGJIT00001 H REFERENCE A
MSD0MFGJIT00001 H REFERENCE 1
MSD0PURMRP00001 E
MSD0PURMRP00001 H REFERENCE C
MSD0PURMRP00001 H REFERENCE 1
MSD2MFGMRP00001 E
MSD2MFGMRP00001 H REFERENCE A
MSD2MFGMRP00001 H REFERENCE 1
MSM1MFGMRP00001 E
MSM1MFGMRP00001 H REFERENCE C
MSM1MFGMRP00001 H REFERENCE 1
MSM2MFGMRP00001 E
MSM2MFGMRP00001 H REFERENCE C
MSM2MFGMRP00001 H REFERENCE 1
MSM3MFGMRP00001 E
MSM3MFGMRP00001 H REFERENCE C
MSM3MFGMRP00001 H REFERENCE 1
MSM3PURMRP00001 E
MSM3PURMRP00001 H REFERENCE C
MSM3PURMRP00001 H REFERENCE 1
MSM3TRNMRP00001 E
MSM3TRNMRP00001 H REFERENCE C
MSM3TRNMRP00001 H REFERENCE 1
MSR0PURMRP00001 E
MSR0PURMRP00001 H REFERENCE A
MSR0PURMRP00001 H REFERENCE 1
MSR1B/TMRP00001 E
MSR1B/TMRP00001 H REFERENCE C
MSR1B/TMRP00001 H REFERENCE 1
MSR2B/TMRP00001 E
MSR2B/TMRP00001 H REFERENCE C
MSR2B/TMRP00001 H REFERENCE 1
MSS0PURMRP00001 E
MSS0PURMRP00001 H REFERENCE A
MSS0PURMRP00001 H REFERENCE 1
** END OF REPORT **
|
Purpose
The Multi-Level Forecast Generation Report prints the parts that were processed for each requested plant. The forecast of the parent will be exploded down the bill of material to create forecast records for the components. Demand records will not be created for build-thru parts, produced parts, produced components, or parts that are reference parts on the bill of material. The Multi-Level Forecast flag on the part master of the parent and the component must be set to Y (yes) for the forecast to be exploded. Only demand from the manufacturing company/warehouse will be exploded.
Report Sequence
Part Number, Demand Type, Customer Reference.