MAC-PAC Homecontact ussupport login 
Documentation > MAC-PAC Reference Library > Manufacturing > Master Scheduling > Reports > Master Scheduling Rollover Requests

Master Scheduling Rollover Requests

MS180

 


 

DATE     2/11/92                             ANDERSEN SOFTWARE                                                         PAGE        1

TIME    10:42:55                                   RUE DE GRAND CHIEN 1

REPORT  MS-180

                                               MASTER SCHEDULING ROLLOVER REQUESTS

 SEQ                FL/   PLN                            START    HORIZON     ---- P R I N T   O P T I O N S ----

 NO    REFERENCE    SEL   CDE   PLT     PART NUMBER       DATE      DTE       PRNT PART DTE   STRT DTE   HRZN DTE

----   ----------   ---   ---   ---   ---------------   --------  --------    ---- ---- ----  --------   --------

0001   USERA         F          BEL                      2/11/92   6/16/92      Y    1    1    0/00/00    0/00/00

                                      MRP-MASTER-PAR         MPW0307   No schedule exists for part within horizon

                                                                             **  END OF REPORT  **

Purpose

The Master Scheduling Rollover Requests Report prints out the parameters that were used to control the Master Scheduling Rollover Program (MS180E) and messages for any errors that occurred during processing.

Report Sequence

None.