Master Scheduling Audit Trail
Master Scheduling Audit Trail
MS500
DATE 2/10/92 ANDERSEN SOFTWARE PAGE 1
TIME 12:36:37
REPORT MS-500
PLANNED ROUTING FILE MAINTENANCE
AUDIT TRAIL
REF FUNC KEY PER KEY FAC PER KEY FAC PER KEY FAC PER KEY FAC PER KEY FAC POST
FUNC NO CODE FAC PART NUMBER NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD DATE
---- ---- --- --- --------------- --- ------------ --- ------------ --- ------------ --- ------------ --- ------------ --------
FROM USER N25 KF1 BOLT-100 2/10/92
TO
FROM USER N25 KF1 BOLT-100 2/10/92
TO
FROM USER N25 KF1 BOLT-100 2/10/92
TO
FROM USER N25 KF1 BOLT-100 2/10/92
TO
FROM USER N25 KF1 BOLT-100 2/10/92
TO
FROM USER N25 KF1 BOLT-100 2/10/92
TO
|
Purpose
The Master Scheduling Maintenance Audit Trail Reports provide a list of all transactions that were posted to a master file. Each of the following master files has its own audit trail report:
· Key Facility File (MS100M)
· Projected Demand File (MS150M)
· Tentative Master Schedule File (MS160M)
Report Sequence
Date and Time of posting to the master file within key values.