Master Scheduling Action Report
Master Scheduling Action Report
MS540
DATE 2/15/93 PAGE 1
TIME 9:03:57 PLANT BEL
REPORT MS-540 MASTER SCHEDULING ACTION REPORT
PLANNER PLANNER NAME MISSING SCHEDULE PERIOD 2/08/93 - 6/28/93
PRINT PERIOD 2/08/93 - 6/28/93
PART M/ PRD PLN SKU PLAN SKU PLAN YIELD F FIX LT DY/ SETUP TRAN RUN
PART NUMBER DESCRIPTION TYPE B TYP SKU POL POL QTY POL INCR FACTOR V MAX MO QTY DAYS DAYS UNITS
--------------- ------------------------- --- - --- --- --- ---------- ---------- ------ - ---------- ------ ------ ----------
ASPIRIN ASPIRIN TABLETS MFG 2 MRP CA F/T 1.000 .000 .00 F .0000 .000 .000 .0000
.000
R E Q U I R E D
--- S C H E D U L E --- ------------ C U R R E N T S C H E D U L E ----------- ------------ A C T I O N -------------
WEEK REQUIRED DUE ORDER ORD O START
STRT DTE QUANTITY DATE NO TYP S DATE QUANTITY YIELD MESSAGE YIELD QUANTITY
-------- ------------ -------- ------- --- - -------- ------------ ------------ ------------ ------------ ------------
2/08/93 .000
2/16/93 .000
2/16/93 ADMREQ REQ R 100.000 100.000
------------
100.000 CANCEL
------------
2/22/93 .000
2/22/93 EMB0002 BLK O 95.000 95.000
------------
95.000 CANCEL
------------
3/01/93 .000
3/08/93 .000
3/15/93 .000
3/22/93 .000
3/29/93 .000
4/05/93 .000
4/12/93 .000
4/19/93 .000
4/26/93 .000
5/03/93 .000
5/10/93 .000
5/17/93 .000
5/24/93 .000
5/31/93 .000
6/07/93 .000
6/14/93 .000
6/21/93 .000
6/28/93 .000
BEYOND
HORIZON .000 .000
END OF SCHEDULE FOR PART
END OF REPORT
|
Purpose
The Master Scheduling Action Report details the schedule which has been arrived at after the Master Schedule Rollover Program (MS180E) has rolled the tentative master schedule into the current master schedule. The report indicates which planned orders were added and changed, and lists suggested actions to firm or open orders.
This report can be requested using several different parameters: which parts to print:
· All parts
· Only parts with action messages
· Only parts with action or planned order messages and which periods to print:
· All periods within the schedule period
· Only periods to the last action message
· Only periods to the last action or planned order message
· Only periods between two user-entered dates
Report Sequence
Part Number within Planner, Week Start Date and Due Date (manufacturing orders and purchase orders).