Documentation >
MAC-PAC Reference Library >
Manufacturing >
Master Scheduling >
Reports >
Key Facility Load Detail Exceptions
Key Facility Load Detail Exceptions
MS550B
DATE 2/10/92 ANDERSEN SOFTWARE PAGE 1
TIME 17:13:38
REPORT MS550B KEY FACILITY LOAD DETAIL
KEY REPORT EXCEPTIONS
FACILITY PART DATE CODE ERROR MESSAGE
------------ --------------- -------- ------- --------------------------------------------------
KF1 4/20/92 MPC0589 No load information for key facility
KF1 4/27/92 MPC0589 No load information for key facility
KF1 5/04/92 MPC0589 No load information for key facility
KF1 5/11/92 MPC0589 No load information for key facility
KF1 5/18/92 MPC0589 No load information for key facility
KF1 5/25/92 MPC0589 No load information for key facility
KF1 6/01/92 MPC0589 No load information for key facility
KF1 6/08/92 MPC0589 No load information for key facility
KF1 6/15/92 MPC0589 No load information for key facility
KF1 6/22/92 MPC0589 No load information for key facility
** END OF REPORT **
|
Purpose
The Key Facility Load Detail Exceptions Report lists all the parts for the requested key facility that were not included on the Key Facility Load Detail Report (MS550) due to an exception. The exception is identified on the report by an error code and an error message.
Report Sequence
Key Facility, Part Number
The following transaction codes are used during the processing of the Master Scheduling module:
Transaction Code
|
|
Description
|
K20
|
|
Tentative MS Add (MS160BP)
|
K25
|
|
Tentative MS Change (MS160BP)
|
K30
|
|
Tentative MS Delete (MS160BP)
|
K50
|
|
Demand Projection Add (MS150BP)
|
K55
|
|
Demand Projection Change (MS150BP)
|
K60
|
|
Demand Projection Delete (MS150BP)
|
M20
|
|
Key Facility Add (MS100BP)
|
M25
|
|
Key Facility Change (MS100BP)
|
M40
|
|
Key Facility Delete (MS100BP)
|
N20
|
|
Planned Routing Add (MS110BP)
|
N25
|
|
Planned Routing Change (MS110BP)
|
N40
|
|
Planned Routing Delete (MS110BP)
|
N50
|
|
Planned Routing Mass Delete (MS110BP)
|