Key Facility Load Detail

MS550A

 


 

DATE    2/10/92                                   ANDERSEN SOFTWARE                                                       PAGE    1

 TIME   17:13:38

 REPORT MS-550                                     KEY FACILITY LOAD DETAIL                                       TENTATIVE SCHEDULE

 REQUESTOR:                                        FROM  2/10/92  TO  2/14/92

                                       KEY                  FACILITY              EFFECTIVE

                                    FACILITY              DESCRIPTION             CAPACITY

                                    --------    ------------------------------    ---------

                                       KF1      KEY FACILITY 1                           8

                                                 ORDER  --ORDER--  B   DUE      ORDER       BALANCE      FACILITY  CUMULATIVE

 PART NUMBER     DESCRIPTION               PLT  NUMBER  TYPE STAT  A   DATE     QUANTITY    TO COMPLETE    LOAD       LOAD

 --------------- ------------------------- --- -------- ---- ----  - -------- ------------ ------------ ---------- ----------

 JIT-MASTER-PAR  JIT/MS/PARENT PART        BEL TNTATIVE               2/10/92      400.000      400.000  60000.000

                                               TNTATIVE               2/17/92      500.000      500.000 375000.000

                                               TNTATIVE               2/24/92      540.000      540.000 405000.000

                                               TNTATIVE               3/02/92      430.000      430.000 322500.000

                                               TNTATIVE               3/09/92      320.000      320.000 192000.000

                                PART TOTAL:                                                             354500.000 354500.000

                                 KF1 TOTAL:                                                                        354500.000

                              PERCENT LOAD:                                                                              9999%

Purpose

The Key Facility Load Detail Report shows detailed information regarding the load each order contributes to the requested key facility.  The user may request the report against either the current schedule, the tentative master schedule, or the simulated schedule.  The load for each order, the cumulative load total, the load percentage, and the effective capacity for the requested key facility are calculated and printed.

Report Sequence

Key Facility, Part Number