Key Facility Load Detail
MS550A
DATE 2/10/92 ANDERSEN SOFTWARE PAGE 1
TIME 17:13:38
REPORT MS-550 KEY FACILITY LOAD DETAIL TENTATIVE SCHEDULE
REQUESTOR: FROM 2/10/92 TO 2/14/92
KEY FACILITY EFFECTIVE
FACILITY DESCRIPTION CAPACITY
-------- ------------------------------ ---------
KF1 KEY FACILITY 1 8
ORDER --ORDER-- B DUE ORDER BALANCE FACILITY CUMULATIVE
PART NUMBER DESCRIPTION PLT NUMBER TYPE STAT A DATE QUANTITY TO COMPLETE LOAD LOAD
--------------- ------------------------- --- -------- ---- ---- - -------- ------------ ------------ ---------- ----------
JIT-MASTER-PAR JIT/MS/PARENT PART BEL TNTATIVE 2/10/92 400.000 400.000 60000.000
TNTATIVE 2/17/92 500.000 500.000 375000.000
TNTATIVE 2/24/92 540.000 540.000 405000.000
TNTATIVE 3/02/92 430.000 430.000 322500.000
TNTATIVE 3/09/92 320.000 320.000 192000.000
PART TOTAL: 354500.000 354500.000
KF1 TOTAL: 354500.000
PERCENT LOAD: 9999%
|
Purpose
The Key Facility Load Detail Report shows detailed information regarding the load each order contributes to the requested key facility. The user may request the report against either the current schedule, the tentative master schedule, or the simulated schedule. The load for each order, the cumulative load total, the load percentage, and the effective capacity for the requested key facility are calculated and printed.
Report Sequence
Key Facility, Part Number