Documentation >
MAC-PAC Reference Library >
Manufacturing >
Master Scheduling >
Key Concepts and Procedures >
Revision Level Generation
Revision Level Generation
Revision level generation is called within the RP Generation and the MS Rollover job stream. The control language programs automatically call the Revision Level Generation Program before calling the RP Generation or MS Rollover Programs. This is to ensure the Revision Level File is correct at the time planning occurs.