This transaction may be performed only if the Shop Floor Control module is installed; otherwise, the burden cost is generated at standard when the manufacturing order receipt is processed.
1
|
machine hour recorded
|
5.0000000
|
accounting standard labor rate per hour - rate 1
|
2.0000000
|
accounting standard labor rate per hour - rate 2
|
1.0000000
|
accounting standard burden rate per hour, applied based on machine rate 4 (valid only for machine-paced workcenters)
|
3.0000000
|
accounting standard burden rate per hour, applied based on labor rate 3
|
1. Machine hours recorded for a labor-paced workcenter
No journal entries generated. Both the labor and the burden costs are calculated based on the labor hours expended.
2. Machine hours recorded for a machine-paced workcenter
DR
|
Work In Process
|
1.00
|
|
CR Accrued Burden - Rate 4
|
1.00
|
Indirect and Setup Machine hours are not costed. These costs should be reflected in the burden rate.