Piece Rate - Scheduled
Piece Rate - Scheduled
The scheduled piece rate is used for scheduling and capacity calculations. When requirements are generated, the scheduled rate is set equal to the standard rate. However, the standard piece rate will be changed if any of the operations are maintained after labor requirements are generated.