Documentation >
MAC-PAC Reference and Help >
Glossary >
Estimated Unit Cost
Estimated Unit Cost
The calculation of the Estimated Unit Cost depends on the type of company/warehouse.
The calculation of the Estimated Unit Cost depends on the type of company/warehouse.
For a manufacturing company/warehouse:
-
If the Product Costing application is installed:
Est. Unit Cost = Stnd Total Labor plus Stnd Total Material plus Stnd Total Overhead
-
If the Product Costing application is not installed:
Est. Unit Cost = This-Level Labor plus This-Level Material plus This-Level Overhead
For a distribution company/warehouse:
-
If the cost option is moving average:
Estimated Unit Cost = Moving Average Unit Cost
-
If the cost option is standard and the part type is equal to 7 (nonstandard):
Estimated Unit Cost = Moving Average Unit Cost
-
If the cost option is standard and the part type is not equal to 7:
Estimated Unit Cost = Standard Unit Cost
-
If the part is configuration coded:
Estimated Unit Cost = Total Standard Cost from the Configuration Master File.