Documentation >
MAC-PAC Reference and Help >
Glossary >
Engineering Change Order - In
Engineering Change Order - In
May be used to define an engineering change order associated with a component relationship. If entered, the engineering change order number must exist on the Engineering Change Order (ECO) File. An engineering change order (In or Out) is required if Reference File category C12 (ECO date update option) is 1-ECO