Current Overhead - This Level

 

The overhead currently required to make this level of the product (excluding overhead incurred in manufacturing the product's components).  This value will not be used to value inventory; it can be used to track fluctuations in cost.  If Product Costing is installed, you can roll this value into the standard cost field.  Entering a Y in the Curr Rollover Code field on this screen will allow you to roll over the current cost to the standard cost during a selective cost rollover. 

This field is displayed only if:

  • Manufacturing Engineering is not installed.
  • The part is manufactured but the routing is not used to generate costs (cost routing flag=No).

In these situations, MAC-PAC cannot calculate labor costs automatically.