Manufacturing Order Dispatch List
Manufacturing Order Dispatch List
SF520
DATE 2/28/92 ANDERSEN SOFTWARE PAGE 1
TIME 11:18:49 PLANT BEL
REPORT SF520
MANUFACTURING DISPATCH LIST REQUESTOR JOHN WILLIAMS
HORIZON DATE 2/02/92
W/C DEPT
NO WORKCENTER DESCRIPTION NO
--- ------------------------------ ---
IAL LABOR-PACED WORKCENTER D10
-----------OPERATION STATUS--------------
ORDER NUMBER/ OPERATION DESCRIPTION/ ORDER QTY/ OPER OP START/ SET QUANTITY/HRS PAST
PART NUMBER PART DESCRIPTION DUE DATE NO LN TY DUE DATE HRS AVAILABLE COMPLETED SCRAPPED BALANCE DUE
--------------- ------------------------------ ---------- ------ -- -------- ---- ---------- ---------- ---------- ---------- ---
IA00001 LABOR PACED OPERATION 5.000 010 00 1 12/03/91 .0 1.000 1.000 .000 .000 63
IA-MFG MANUFACTURED PART 12/03/91 12/03/91 1.00 1.00 .00
MBM0002 ASSEMBLAGE 10.000 010 00 1 1/06/92 .0 .000 .000 .000 .000 39
SYV-SHIP-9 SYN VERT EXCEPT. SHIPMT 8 1/06/92 1/06/92 .00 .00 .00
BDS STANDARD OPERATION 10000.000 010 00 1 1/15/92 .0 10000.000 .000 20.000 9980.000 0
BOLT-200 BOLT-200 1/15/92 10/29/96 10000.00 .00 9980.00
MBM0005 OP1 300.000 010 00 1 1/21/92 .0 .000 .000 .000 .000 10
MFG MFG PART 2/14/92 2/14/92 .00 .00 .00
** END OF WORKCENTER **
** END OF REPORT **
|
Purpose
The Manufacturing Order Dispatch List provides details of outstanding operations by workcenter. The report detail lines are printed in ascending labor requirements start date sequence (that is, earliest first).
The user may request Manufacturing Order Dispatch Lists for all workcenters or for a specified workcenter only. A horizon date is specified on the request before or on which the labor requirements start date must fall in order to be printed on the report. If any operation within the specified horizon is past due, the number of days past due is printed on this report.
Report Sequence
Workcenter Number, Labor Requirements Start Date.