WILLIAMS PLT BEL REQUIREMENTS PLANNING 4/16/97
DSP01 REQUIREMENTS REVIEW DAILY
AC-COPY TESTER Part Type MFG UM EA REPLAN
Yield Factor .00 Planning Pol Code A/R M
Fixed Leadtime Days .000000 Planning Pol Qty .000
Planning Balance 30.000- Planning Pol Incr .000
Maximum Order Qty .000
Required Projected Supply
Date Quantity Inventory Quantity
11/04/96 100.000 100.000-
11/21/96 20.000 120.000-
2/17/97 40.000 160.000-
2/18/97 10.000 170.000-
3/04/97 1050.000 1220.000-
3/11/97 20.000 1240.000-
3/24/97 90.000 1330.000-
4/15/97 1.000 1331.000-
4/16/97 30.000 1361.000-
4/17/97 1.000 1362.000- +
F2=Command F3=Exit F7=MO Det/Summary
F8=Order Shortage F9=Time-Phased P/A F12=Stock Status F24=More Keys
MPW2396 Forecast and target inventory are not included
This screen displays any requirements (demand), orders/requisitions (supply), and flow authorizations (supply) for a specified part in daily buckets. Projected inventory is calculated by day. The upper part of the screen shows the key planning information of the item. The literal in the top right hand corner shows whether or not there have been any changes since RP ran and determines if the part needs to be replanned or reanalyzed. Depending on the option that you entered in the RP Run Mode field on the Function Select screen, this screen will be displayed in either actual mode or in simulation mode.
PLANT
Display only. Used to identify the plant in which maintenance/inquiry will be done. The plant must be valid, and you must be authorized to the manufacturing company/warehouse associated with the plant (Reference File category 409). Defaults to the plant assigned to your user ID.
HORIZON DATE
The planning horizon used to limit the display is the same as that calculated during the MRP run. The horizon may be extended by changing either the order action planning factor on the MRP request screen, or the cumulative lead time for the selected item. Cumulative lead time should not be changed manually, as it will be overwritten when the next generation is run. Horizon for JIT parts is changed by altering the JIT plan days factor or by setting the horizon on the Function Select screen.
PART NUMBER/PART DESCRIPTION
Display only. The part entered on the Function Select screen. It must be an active part which is not a reference or planning part.
PART TYPE
Display only. The type assigned to this part on the Part Master file.
UNIT OF MEASURE
Display only. The stockkeeping unit of measure for this part from the Part Master File (DE100M).
YIELD FACTOR
Display only. Used to inflate the item order quantity to account for expected scrap by increasing the required demand quantity of the parent part and planning the order quantity accordingly in the Master Scheduling and Requirements Planning modules.
PLANNING POLICY CODE
Display only. This is the Order Policy Code assigned to the part in the Part Master file. One of the system-defined or user-defined codes on Reference File category 404.
DEMAND CODE
Display only. This field determines the planning method for the part. Valid values are:
D - Daily Master Scheduled part
M - Standard Master Scheduled part
R - Requirements Planning part
S - Service part
FIXED LEADTIME DAYS
Display only. The number of working days that the vendor or fixed-time portion of the manufacturing process takes to deliver or complete a standard-sized lot from release of order.
PLANNING POLICY QUANTITY
Display only. The quantity of this part that is normally ordered.
PLANNING BALANCE
Display only. The quantity of the item that is currently available in inventory. It is calculated as follows:
Inventory in the on-hand balance type
Plus Inventory in all other balance types at the manufacturing warehouse that are available for planning.
Plus work in process
Plus distribution inventory at any distribution warehouse where the Available for Planning flag (on the Warehouse Description File) is Yes.
Minus inventory reserved for customer orders, if any balance types are available for both planning and distribution and the Sales Order Planning flag on the Warehouse Description File is No (indicating that sales orders sourced from distribution inventory are not included in demand calculations).
If the part is potency controlled, the quantity in this field is displayed in reverse image and reflects the planning balance in terms of potent units. Potent units are calculated as follows:
SKU for each balance type on each part/lot/location multiple location record
Multiplied by the actual potency on the lot control master record for the part/lot
Divided by the standard potency percentage on the Part Master record for the plant
If negative inventory is being ignored (inventory netting flag is set to 'I'), then this field will be displayed in reverse image and will reflect the real-time amount (not zero). However, the supply demand for this part and displayed real-time, will not account for negative inventory that existed at the time of planning.
POLICY INCREMENT
Display only (in a job-controlled environment). The quantity of this part that is normally ordered beyond the first quantity ordered.
JOB NUMBER/JOB DESCRIPTION
Display only (in a job-controlled environment). The job for which the information is displayed. Must be a valid job from the Job Master file.
JOB STATUS CODE
Display only (in a job-controlled environment). The status of the job as defined on the Job Master file. The valid system supplied status codes are:
O - Open
C - Closed
Z - Costing Closed
You may define other Job Status Codes on Reference File category D48.
DATE
Display only. The order/requisition due date for supply lines, the component required date or the forecast date for demand lines.
REQUIRED QUANTITY
Display only. The amount of this item that is required on the specified date. If the Display Target Inventory flag was 'Y', target inventory will be included in this field. Target inventory records will not, however, reduce the quantity in the projected inventory column like other requirements, because they are a time-phased restatement of existing demand.
PROJECTED INVENTORY
Display only. Netting of supply and demand produces expected inventory levels according to the current schedule. Forecast quantities may be included in the projected inventory. A warning message will be displayed indicating whether forecast is included or not included in the project inventory.
SUPPLY QUANTITY
Display only. For supply orders/requisitions only, the expected deliverable quantity taking into account the yield factor of the item.
COMMAND KEYS
Enter - Display the Function Select screen.
F2 - Display a window where a fast path option or mnemonic can be entered. Fast path allows the next menu selection to be made directly from this screen. When the window is displayed, pressing F3 will remove it.
F3 - Exit program and return to menu. If this screen was accessed from another conversation, pressing F3 will return you to that original conversation.
F7 - The Manufacturing Order Status Summary screen is displayed for the part number on the header screen when no specific order is selected. The Manufacturing Order Status Detail screen is displayed when a specific manufacturing order is selected.
F8 - The Order Shortage Detail screen is displayed for the order selected from the folded line record.
F9 - Review the detailed issues and receipts for the selected item in the Time-phased Part Availability Inquiry.
F12 - The Inventory Stock Status Detail screen is displayed for the part selected from the folded line record, or for the part number from the header screen if none is selected.
F13 - The Warehouse Stock Status Detail screen is displayed for the part number selected from the folded line record, or for the part number for the Header screen if none is selected.
F14 - This function key displays the Simulation Schedule Maintenance conversation.
F24 - Display additional command keys that are valid for the current screen.
|