Requirements Planning Generation Request

RP520A

 


 

DATE     7/15/94                              ANDERSEN CONSULTING APPLICATIONS, INC                                    PAGE        1

TIME    13:43:43                                   PICKING & SHIPPING INC                                              PLANT     BEL

REPORT  RP-520A

                                              REQUIREMENTS PLANNING GENERATION REQUEST

                                                PLANNING MODE                  S

                                                GENERATION DAYS                150

                                                PRINT PLANNING ACTION REPORT   Y

                                                RP GENERATION RUN DATE          7/15/94

                                                RUN CONBON ANALYSIS            N

                                                SUMMARIZE FLOW REQS            N

                                                END FIRM HORIZON DATE           7/21/94

                                                DAILY MS PARTS                 Y

                                                RP PARTS                       Y

                                                SERVICE PARTS                  Y

                                                FORECAST CONSUMPTION PERIOD    N

                                                MULTI-LEVEL SELECTIVE MODE     Y

         DEFAULT COMM CODE OPTS :

                         PLANNING     JIT     PRINT EXCEP   PRINT EXCEP   PRINT PLAN   RE-SCHED   RE-SCHED

                          FACTOR    HORIZON      ONLY       BEYOND HRZ    EXCEPTIONS    EARLY       LATE

                            ----    --------       -             -            -           --         --

                            9.0     12/26/97       N             Y            Y            1          1

                            TR PREFIX                       T         TR STARTING NUMBER           5410

                            MO PREFIX                       M         MO STARTING NUMBER           7145

                            RQ PREFIX                       R         RQ STARTING NUMBER           6365

                                                                             **  END OF REPORT  **

Purpose

The Requirements Planning Generation Report Request contains the parameters that were used to control the Requirements Planning Generation Programs, RP100E and RP105E.  Default commodity code options are also listed.  This report, along with the Requirement Planning Print Parameters Report (RP520B) and the Planning Action Report (RP520C), is printed upon request.  It can be run in either simulation or actual mode.

Report Sequence

None.