Allocation Data
WILLIAMS CO 001 REPETITIVE SUPPLY 8/26/93
DSP01 WHS BEL ENDORSEMENT MAINTENANCE ALLOCATION
ADDITION
Order Number AAAPO1 Line Number 001
Endorsement 000005 Effectivity Date 8/27/93
Vendor Number ACME ACME WHOLESALE PRODUCTS
Part Number BOLT-100 BOLT-100 - PURCHASED
PO Generation Mode 2 QTY NOT ACCT'D - DAY
Stockkeeping UM EA EACH SKU per PU
Purchasing UM BX BOX 12 / 1
Order Increment 1
Minimum Order Quantity 1
Maximum Order Quantity 999999999
Rank/Limit of Rank (SKU) 5 1.000 Planned Quantity 1.000
Schedule Type 1 CONSUMPTION ANTICIPATION
Delivery Type 1 CANCEL AND REP
Drawing Number
F2=Command F3=Exit F4=Prompt F5=Previous Screen
F9=Inquiry F10=Select F15=Rekey Data
The Endorsement Maintenance Allocation Screen.
|
The following allocation data is defined.
· The order increment per release
· The minimum order quantity per release
· The maximum order line quantity
The first two fields are used when planned requisitions are being allocated. The quantity allocated to the purchase order line will be a multiple of the order increment specified in the endorsement.
If the quantity allocated to a purchase order line is less than the minimum order quantity per release, it is adjusted to the minimum order quantity per release. The minimum order quantity defaults from the item/vendor relationship when the first endorsement is created. The maximum order quantity defaults to the highest value possible.
· Rank/Limit of Rank (SKU)
The Rank/Limit of Rank field is used if the PO Generation Mode field (which is found on the Purchasing screen of Part Master Maintenance) is 1, 4, 7, or A. The Rank/Limit of Rank field is used as a way to allocate planned requisitions to preferred vendors according to the negotiated quantity (limit of rank). The rank has a value between 1 and 5. A planned requisition is assigned to the vendor having the highest rank (for example, 1) until the limit of rank is reached. If there is any amount that remains to be allocated from this planned requisition, the amount is assigned to the vendor with the next highest rank (for example, 2).
This is the most straightforward method and is probably the best to use for “simple” relationships with vendors. For example, if you always purchase an item from the same vendor, this is the most appropriate method to use.
· Planned Quantity
The planned quantity is used for parts having a PO generation mode of:
2, 5, 8, or B - allocation by planned quantity not accounted for
3, 6, 9, or C - planned quantity
The planned quantity is used to calculate the vendors’ quota. (Refer to the Endorsement Allocation key concept.)
The following three fields also appear on the Endorsement Maintenance and Inquiry screens. They are used for informational purposes only.
· Schedule Type
· Delivery Type
· Drawing Number