PC810S08 - Cost Elements

 

 

 

 

WILLIAMS   PLT MFG         PRODUCT COST ANALYSIS           USD         1/29/92

 DSP01                          COST ELEMENTS                                  

                                                                                

             BATCH-A             TEST PART WITH BATCH QTY                      

             Revision Level 000                                                

                                                                               

             Cst                                Current                        

             Cde      Cost Description            Cost                         

             LBO  LABOR BASED OVERHEAD              .6400000                   

             LRC  LABOR RATE                       2.2400000                   

             MTC  MATERIAL                         3.0000000                   

                                                                               

                                                                               

                                                                               

                                                                               

                                                                               

                                                                               

                                                                               

                                                                               

                                                                               

                                                                               

 F2=Command          F3=Exit             F7=Material         F8=Labor          

 F11=Summary                                                                   

 

This screen displays each cost element and its associated cost for the requested part.  Cost elements for purchased parts are maintained using The Part Cost Maintenance Program (DE105E).  Cost elements for manufactured parts are created when a cost generation is performed as an accumulation of the costs elements and workcenter rates associated with the bills of material and routings at lower levels of the bills of material.

PLANT

Display only.  The plant where the part is manufactured or for which it is purchased.

BASE CURRENCY

Display only.  Base currency associated with company/location that is assigned to the manufacturing company/warehouse in this plant.

PART NUMBER/DESCRIPTION

Display only.  The part whose cost information is displayed together with its description.

REVISION LEVEL

Display only.  The information on the screen represents costs for this revision level of the item.

COST CODE

Display only.  The individual types of costs associated with the item.  Purchased parts are assigned costs elements through the Part Cost Maintenance conversation.  Labor and overhead rates are assigned cost elements through the Workcenter Rates Maintenance conversation.  The cost codes are defined on Reference File category C17.

COST DESCRIPTION

Display only.  Text describing the type of cost incurred.  Cost elements and their descriptions are defined on Reference File category C17.

COST

Display only.  Current, standard, or simulated cost of the cost element for the part.  The cost selection is requested on the select screen.

COST TYPE

Display only.  Indicates whether the cost should be rolled up into the material, labor, or overhead bucket.

COMMAND KEYS

Enter - Return to the select screen.

F2    - Display a window where a fast path option or mnemonic can be entered.  Fast path allows the next menu selection to be made directly from this screen.  When the window is displayed, pressing F3 will remove it.

F3    - Exit program and return to menu.

F7    - Display component cost details for the part.

F8    - Display the labor detail for the part.

F11   - Display the summary costs for the part.