WILLIAMS   PLT BEL         PRODUCT COST ANALYSIS           BEF         3/05/93

 DSP01                       LABOR - CURRENT COST                              

   EFFECTIVITY DATE   3/02/93                          GENERATION DATE   3/02/93

                                                                               

   BIKETIRE         BIKE TIRE                                                   

   Oper                                 W/C Op C  No   No              R       

 S  No   Description                     No Ty F Pers Mach Lbr Piece Rate      

             Material            Labor          Overhead           Total       

   150   ASSEMBLE SPOKES                SPO  1 Y  2.0   .0       1.000000      

                  .0000000         .0000000       13.2000000       13.2000000  

   160   ASSEMBLE BIKETIRE              SP2  1 Y  2.0   .0       1.000005      

                  .0000000         .0000000      246.2447688      246.2447688  

      

     

     

      

            

      

          

                                                                               

 F2=Command          F3=Exit             F7=Material         F11=Summary       

 F12=Cost Elements                                                             

                                                                                                                                   

 

 

This screen displays the contribution to material, labor, and overhead costs for each operation in the routing of a manufactured part.  The calculation is based on the latest routing information for each operation.

OPERATION COSTING LOGIC

Review the extended glossary text for a description of the use of the routing fields in operation costing.

Enter an 'X' in the Select field and press ENTER to view the operation detail (by rate code) for the workcenter.

PLANT

Display only.  The costs displayed on the screen are incurred when the parent part is manufactured in this plant.

BASE CURRENCY

Display only.   Base currency associated with company/location that is assigned to this manufacturing company/warehouse in the plant.

SIMULATION TRIAL ID

Displayed only if a simulated cost type was specified on the select screen.  The name or identification number of the simulation for which information is shown.

EFFECTIVITY DATE

Display only.  This is the date on which the last generation was based.  The costs displayed on the screen are based on the routing steps that are in effect on this date. 

GENERATION DATE

Display only.  The date when these costs were calculated.  Any changes to the routing or rate information entered after this date are not reflected in the costs.

PART NUMBER/DESCRIPTION

Display only.  The part being manufactured together with its description.  This screen displays the costs incurred at each step in the part's manufacturing process.

SELECT

Optional.  Type an X in this field and press Enter to view detailed rate information about the corresponding operation.

OPERATION NUMBER

The sequence number of the operation from the routing.

DESCRIPTION/ W/C NO/ OP TY/ C F/ NO PERS/ NO MACH/ PIECE RATE/ R C/ MATERIAL COST/ LABOR COST/OVERHEAD COST/TOTAL COST

The detailed information used to calculate costs

Description - The description of the operation.

W/C No - Workcenter Number.  The workcenter where the work is performed (as specified on the routing).  The labor and overhead rates defined for this workcenter are used to cost the corresponding operation.

Op Ty - Operation type.  Indicates whether the operation is a standard operation or master operation.  Also indicates what type of overlap is allowed for the operation.

CF - Crew Operation Flag - Indicates whether the operation is a crew operation (Y) or not (N).

No Pers - The number of persons required to perform the operation.

No Mach - The number of machines used when performing the operation.

Piece Rate - Either the number of pieces made per hour or the number of hours required to make one piece.  For labor-paced operations, this is labor hours.  For machine-paced operations, it represents machine hours.

RC - The rate code used to cost this operation.

Material - The standard material cost incurred at this operation per piece.

Labor - The standard labor cost incurred at this operation per piece. 

Overhead - The standard burden cost incurred at this operation per piece.

Total - Material Cost + Labor Cost + Overhead Cost

COMMAND KEYS

Enter - Return to the select screen.

F2    - Display a window where a fast path option or mnemonic can be entered.  Fast path allows the next menu selection to be made directly from this screen.  When the window is displayed,  pressing F3 will remove it.

F3    - Exit program and return to menu.

F7    - Display the material detail for the part.

F11   - Display summary costs for the part.

F12   - Display cost elements for the part.