MAC-PAC Homecontact ussupport login 
Documentation > MAC-PAC Reference Library > Manufacturing > Product Costing > Reports > Standard Cost Rollover Report

Standard Cost Rollover Report

PC120

 


 

DATE    2/03/92                              ANDERSEN SOFTWARE                                                            PAGE     1

TIME   18:46:09

REPORT PC-120

                                                   STANDARD COST ROLLOVER REPORT

                   OPTION    DESCRIPTION                            PLANT

                     -       ------------------------------------    ---

                     1       PARTS PREVIOUSLY SELECTED FOR UPDATE    BEL

                                                                             ** END OF REPORT **

Purpose

The Standard Cost Rollover Report prints the option entered by the user when requesting a standard cost update rollover: selective cost rollover or full cost rollover.  The report is printed after the Standard Cost Update Rollover Program (PC120E) is executed.

Report Sequence:

Part Number.