Cost Summary Report

PC520

 

DATE    1/30/92                              ANDERSEN SOFTWARE                                                           PAGE      1

TIME    9:46:05                                                                                                          PLANT   BEL

REPORT PC-520

                                                        COST SUMMARY REPORT

                                                              CURRENT

                                                   COST GENERATION DATE:  1/30/92

                                                       EFFECTIVITY DATE:  1/30/92

PART NUMBER/     PART  PRD  COMM A   ENG     SET   CURRENT COST       CURRENT COST       CURRENT COST        CURRENT COST

DESCRIPTION      TYPE  TYP  CODE C   REV UM COST     MATERIAL             LABOR            OVERHEAD              TOTAL

---------------   ---  ---   --- --  --- -- ---- ------------------ ------------------ ------------------ -------------------

A                 MFG  MRP       FG  000 EA   .0          5.6300000          4.1500000          3.1500000          12.9300000 TC

A PART                                                     .0000000          4.1500000          3.1500000           7.3000000 TL

B-4               BDL            01      EA   .0          4.0000000          4.0000000          4.0000000          12.0000000 TC

BUNDLE OF FOUR                                            3.0000000          4.0000000          2.0000000           9.0000000 TL

BC-LOTASSIGN      PUR  MRP       02  000 EA   .0          5.0000000          5.0000000          5.0000000          15.0000000 TC

BOLT-100                                                  3.0000000          4.0000000          5.0000000          12.0000000 TL

                                                                             ** END OF REPORT **

Purpose

The Cost Summary Report provides current or standard cost information for each active part on the Part Master File.  The listing for each part shows this-level and total costs for material, labor and overhead.

Report Sequence

Plant, Part Number.