Documentation >
MAC-PAC Reference Library >
Manufacturing >
Product Costing >
Reports >
Cost Generation Report
Cost Generation Report
PC100
DATE 1/30/92 ANDERSEN SOFTWARE PAGE 1
TIME 9:15:10 PLANT BEL
REPORT PC-100 REQUESTOR WILLIAMS
COST GENERATION REPORT
RUN CONTROL PARAMETERS
COST STD ROLLOVER COST SIM TRIAL RTG FILE EFF
TYPE FLAG PCS GENERATION ID PRESENT DATE REQUESTOR
---- ------------ --- ---------- --------- -------- -------- --------------------
CUR Y YES S YES 1/30/92 WILLIAMS
** END OF REPORT **
|
Purpose
The Cost Generation Report lists the request data on the System Control File entered by the user when requesting a cost generation or simulation. It lists the simulation transactions entered by the user if a simulation was requested. It also lists any errors detected in these simulation transactions. The report is printed after a cost generation or simulation is processed.
Report Sequence
Request Data, Simulation Transactions (commodity code, part number, workcenter mass change, workcenter number).