WILLIAMS PLT BEL MANUFACTURING ENGINEERING 3/03/93
DSP01 ROUTING INQUIRY SELECT
Part Number BIKETIRE
Effectivity Date 030393
Display Comments N
Display Alternates N
F2=Command F3=Exit F4=Prompt F9=Maintenance
F11=BOD Inquiry F12=BOD Maintenance F17=New Plant
This screen is used to request a display of all routing steps for a specified part.
PLANT
Required. Used to identify the plant in which routing inquiry will be done. The plant must be valid, and you must be authorized to the manufacturing company/warehouse associated with the plant (Reference File category 409). Defaults to the plant assigned to your user ID, but may be changed by pressing F17.
PART NUMBER
Required. Must be a manufactured or transfer part that has operations currently defined.
EFFECTIVITY DATE
Required. Only those routing steps that are effective on the requested date will be displayed. If you wish to review all operations, regardless of effectivity, enter ALL.
DISPLAY COMMENTS
Required. Valid values are:
Y - Display comments
N - Exclude comments from the display.
DISPLAY ALTERNATIVES
Required. Valid values are:
Y - Display both primary and alternative operations
N - Display primary operations only.
COMMAND KEYS
Enter - Display the detail screens.
F2 - Display a window where a fast path option or mnemonic can be entered. Fast path allows the next menu selection to be made directly from this screen. When the window is displayed, pressing F3 will remove it.
F3 - Exit program and return to menu.
F4 - Display a list of values for the field where the cursor is positioned. If you select one of the items from the list, it will be returned to the application screen.
F9 - Enter the Routing Maintenance program.
F11 - Enter the Bill of Documents Inquiry program
F12 - Enter the Bill of Documents Maintenance program.
F17 - Change the plant in which the user is currently working.
|