WILLIAMS PLT BEL MANUFACTURING ENGINEERING 1/16/97
DSP01 ROUTING FILE MAINTENANCE ADDITION (MSC)
Part Number BOLT-200
Operation Number 050 00
Operation Description
Workcenter Number Op Leadtime Days
Eng Change Order - In Effectivity In Date
Eng Change Order - Out Effectivity Out Date
F2=Command F3=Exit F4=Prompt F9=Inquiry
F10=Function Select F15=Rekey Data F24=More Keys
This screen allows you to define or modify the description of a miscellaneous cost operation. A miscellaneous cost operation may be used:
1 - To define a production step that is performed outside of the shop floor, such as subcontracted labor,
2 - To associate a miscellaneous cost with a production order for the part.
PLANT
Display only. The plant where the routing is used. It was specified on the Function Select screen.
PART NUMBER
Display only. The item manufactured using this routing. It was specified on the Function Select screen.
OPERATION NUMBER AND OPERATION LINE NUMBER
Display only. The unique, sequential number assigned to the miscellaneous cost step on the routing. The operation number is the first three digits; the operation line number is the last two digits.
OPERATION DESCRIPTION
Required. Used to describe the operation; appears on the shop paperwork and on various inquiries and reports. Extended description may be entered using routing comments (Option 7 from the Routing Maintenance Menu).
WORKCENTER NUMBER
Required. The workcenter number should refer to an outside process at which this operation takes place. The workcenter number must be numeric and greater than or equal to 900.
OPERATION LEADTIME DAYS
Optional. Specifies the number of days required to complete the miscellaneous cost operation.
ENGINEERING CHANGE ORDER - IN
Required if Reference File category N38 (Routing ECO Date Option) is 1 - ECO Required. Identifies the ECO that brings an operation into effectivity. If entered, must be defined on the ECO file.
EFFECTIVITY-IN DATE
Optional. The date on which the operation first becomes effective. If field is left blank, but the ECO field has been entered, the date is defaulted from the ECO file. The date is system maintained if Reference File category N38 is 1 or 2.
ENGINEERING CHANGE ORDER - OUT
Required if Reference File category N38 (Routing ECO Date Option) is 1 - ECO Required. Identifies the engineering change that causes the operation to be removed from the routing. If entered, must be defined on the ECO file.
EFFECTIVITY-OUT DATE
Optional. The date after which the operation is no longer effective. If field is left blank, but the ECO field has been entered, the date is defaulted from the ECO file. The date is system maintained if Reference File category N38 is 1 or 2.
COMMAND KEYS
Enter - Update changes.
F2 - Display a window where a fast path option or mnemonic can be entered. Fast path allows the next menu selection to be made directly from this screen. When the window is displayed, pressing F3 will remove it.
F3 - Exit program without update.
F4 - Display a list of values for the field where the cursor is positioned. If you select one of the items from the list, it will be returned to the application screen.
F9 - Enter the Routing Retrieval Inquiry without updating changes.
F10 - Return to the Function Select screen without updating changes.
F11 - Enter the Bill of Documents Inquiry program.
F15 - Respecify part and operation numbers.
F19 - Enter Comment Maintenance screen without update.
|