WILLIAMS PLT BEL MANUFACTURING ENGINEERING 1/16/97
DSP01 MULTI-LINE ROUTING FILE MAINTENANCE MULTI - MRP
Part Number BOLT-200 BOLT 200
Seq Oper Op W/C No No Set Piece Rate/ Ovrlp P-Q/ P In ECO Date /
No No Ln Ty C/F Pers Mach Hrs Op Leadtime Ds Mach Tool Q Out ECO Date
001 001 00 1 WC1 5.0 1.000000
002 N OPERATION ONE TEST
003 010 00 4 AAA 1.0 1.000000 1 P ECC001 121796
004 N DESCRIPTION FOR WORKCENTER AAA MACH1 SHARP
A
IN OUT
F3=Exit F7=Detail F9=Inquiry F10=Select
F11=R/T Maintenance F15=Rekey Data F24=More Keys
This workline allows you to add or change information for a primary or alternate operation on the routing. It is displayed when A (add a standard operation) was specified as the maintenance code or when U (update) was specified and a standard operation was entered in the Sequence Number field.
SEQUENCE NUMBER
Display only. The routing line being maintained.
MAINTENANCE CODE
Display only. The type of maintenance being performed.
OPERATION NUMBER
Required. A unique identification of a routing step. It defines the order in which the steps are performed on the routing.
OPERATION LINE NUMBER
Required. For a standard operation, use a line number of 00. Use a non-zero line number for an alternate operation.
OPERATION TYPE
Required. Valid values are defined on Reference File category F75. For more information about operation types, type an X in the space to the left of this description and press F11.
WORKCENTER NUMBER
Required. The workcenter where the operation is performed. Workcenter numbers that are numeric and greater than or equal to 900 are reserved for miscellaneous cost workcenters and are not valid for operations on this screen.
NUMBER OF PERSONS
Required for labor-paced operations. Optional for machine-paced operations. The number of persons (or crew size) required to run the operation.
NUMBER OF MACHINES
Required for machine-paced operations. Optional for labor-paced operations. The number of machines required to run the operation.
SETUP HOURS
Optional. The number of hours required to set up the operation, regardless of order quantity. This field contains one decimal place. It is used in Shop Floor Control to schedule operations and in Capacity Planning to analyze load.
PIECE RATE
Required. For operation types 1-5, enter the production rate in terms of either the pieces per hour or the hours per piece (depending on the Piece Rate Standard that was defined on the manufacturing warehouse for the plant). For fixed-time operations (types 6 and 7), enter the amount of fixed time incurred for the batch quantity at the operation step.
CREW OPERATION FLAG
Required. Specifies whether or not the operation is a crew operation. Valid values are:
Y - Yes, the operation is a crew operation. Quantities will be recorded by the crew reporter.
N - No, the operation is not a crew operation. Quantities will be recorded by individual operators. The field must be N for machine-paced workcenters.
OVERLAP PERCENT/QUANTITY
Must be blank for operation types 1, 2, 3, 6, or 7. Required for operations types 4 and 5. The percentage or quantity of parts that should be completed at the preceding operation before this operation can begin. The Overlap P/Q Code field specifies whether this field contains a percentage or a quantity. A percent must be greater than 0 and less than or equal to 100. The overlap quantity has no decimal places.
OVERLAP P/Q CODE
Must be blank for operation types 1, 2, 3, 6, and 7. Required for operation types 4 and 5. Specifies whether the value in the Overlap Percent/ Quantity field is a percentage (P) or a quantity (Q).
ENGINEERING CHANGE ORDER - IN
Required if Reference File category N38 (Routing ECO Date Option) is 1 - ECO Required. Identifies the ECO that brings an operation into effectivity. If entered, must be defined on the ECO file.
EFFECTIVITY-IN DATE
Optional. Used for an "in" engineering change to indicate the first date when the operation should appear on the routing. If field is left blank, but the ECO field has been entered, the date is defaulted from the ECO file. The date is system maintained if Reference File category N38 is 1 or 2.
ENGINEERING CHANGE ORDER - OUT
Required if Reference File category N38 (Routing ECO Date Option) is 1 - ECO Required. Identifies the engineering change that causes the operation to be removed from the routing. If entered, must be defined on the ECO file.
EFFECTIVITY-OUT DATE
Optional. Used for an "out" engineering change to indicate the date after which the operation should be removed from the routing. If field is left blank, but the ECO field has been entered, the date is defaulted from the ECO file. The date is system maintained if Reference File category N38 is 1 or 2.
WORKCENTER DESCRIPTION
Required. Text describing the workcenter. It will be printed on shop paperwork and various inquiries and reports.
MACHINE NUMBER
Optional. The machine required or recommended for the operation. No validation is performed.
TOOL NUMBER
Optional. Used to document any tooling required for this operation. Additional tooling may be defined in the comments for this operation. No validation is performed.
COMMAND KEYS
Enter - Update changes. If you press a command key to move to another program before pressing Enter, your changes will not be updated.
F2 - Display a window where a fast path option or mnemonic can be entered. Fast path allows the next menu selection to be made directly from this screen. When the window is displayed, pressing F3 will remove it.
F3 - Display Manufacturing Engineering Menu to select another option.
F4 - Display a list of values for the field where the cursor is positioned. If you select one of the items from the list, it will be returned to the application screen.
F7 - Display the detail screen for the operation line currently being worked on.
F9 - Enter the Multi-Line Routing Inquiry.
F10 - Return to Function Select screen without updating changes.
F11 - Enter Routing File Maintenance program.
F12 - Enter the Bill of Documents Maintenance program.
F13 - Enter the Bill of Documents Inquiry program.
F15 - Redisplay screen before most recent changes.
F20 - Directly call the Workcenter Inquiry program. When exiting the W/C Inquiry, control will be passed back to this screen.
F24 - Display additional command keys available from this screen.
|