Routing Retrieval
ME051
DATE 2/10/92 ANDERSEN SOFTWARE PAGE 1
TIME 12:06:58 PLANT BEL
REPORT ME-051 REQUESTOR JOHN WILLIAMS
ROUTING RETRIEVAL
EFFECTIVITY DATE: 2/10/92
PART PRD COMM ENG PLN PLAN POL FIXED
PART NUMBER PART DESCRIPTION UM TYPE TYP CODE REV POL QUANTITY L/T DAYS
--------------- ------------------------- -- --- --- --- --- --- ---------- ----------
COMPUTER-100 PC COMPUTER EA MFG MRP 000 A/R .000 .0000
OPER OP W/C C SETUP PIECE S SN NO NO OPER EFFECTIVITY
NO LN OPERATION DESCRIPTION TY NO F HOURS RATE F FC PERS MACH MACH TOOL OVERLAP L/T I/O DATE
--- -- ------------------------------ - --- - ----- ---------- - -- ---- ---- ----- ----- ---------- --- --- --------
010 00 BUILD COMPUTER 1 WL1 N 1.0 .5000 2.0 .0
015 00 OUTSIDE PAINTING OPERATION 950 5 IN 2/01/92
020 00 INSPECT COMPUTER 1 WL1 N .0 .2000 1.0 .0
** END OF REPORT **
|
Purpose
The Routing Retrieval Report provides a list of all operations required to manufacture the requested part. Depending on the production type of the part, the JIT routing or MRP routing header is used to display the operations. This report is printed upon request.
Report Sequence
Operation Number for the requested part.