Reference Manufacturing Routing
ME060
DATE 2/11/92 ANDERSEN SOFTWARE PAGE 1
TIME 15:06:33 PLANT BEL
REPORT ME-060 REQUESTOR JOHN WILLIAMS
REFERENCE MANUFACTURING ROUTING
EFFECTIVITY DATE: ALL
PART PRD COMM ENG PLN PLAN POL LEAD
PART NUMBER PART DESCRIPTION UM TYPE TYP CODE REV POL QUANTITY TIME BATCH QTY
--------------- ------------------------- -- --- --- --- --- --- ---------- ---------- ----------
COMPUTER-100 PC COMPUTER EA MFG MRP 000 A/R .000 .0000 1.000
OPER OP W/C C SETUP PIECE S SN NO NO OPER EFFECTIVITY
NO LN OPERATION DESCRIPTION TY NO F HOURS RATE F FC PERS MACH MACH TOOL OVERLAP L/T I/O DATE
--- -- ------------------------------ - --- - ---- ---------- - -- ---- ---- ----- ----- ---------- --- --- --------
010 00 BUILD COMPUTER 1 WL1 N 1.0 .5000 2.0 .0
015 00 OUTSIDE PAINTING OPERATION 950 5 IN 2/01/92
020 00 INSPECT COMPUTER 1 WL1 N .0 .2000 1.0 .0
|
Purpose
The Reference Manufacturing Routing Report provides a list of all operations required to manufacture the requested parent part.
Report Sequence
Operation Number within Plant and Parent Part Number.