Reference Manufacturing Routing

ME060

 

DATE    2/11/92                                 ANDERSEN SOFTWARE                                                         PAGE     1

TIME   15:06:33                                                                                                           PLANT  BEL

REPORT ME-060                                                                                         REQUESTOR JOHN WILLIAMS

                                                       REFERENCE MANUFACTURING ROUTING

                                                          EFFECTIVITY DATE: ALL

                                               PART  PRD  COMM  ENG  PLN   PLAN POL      LEAD

PART NUMBER      PART DESCRIPTION          UM  TYPE  TYP  CODE  REV  POL   QUANTITY      TIME     BATCH QTY

--------------- -------------------------  --   ---  ---   ---  ---  ---  ----------  ----------  ----------

COMPUTER-100    PC COMPUTER                EA   MFG  MRP        000  A/R        .000       .0000       1.000

  OPER                                OP W/C C SETUP   PIECE    S SN  NO   NO                         OPER EFFECTIVITY

 NO  LN OPERATION DESCRIPTION         TY NO  F HOURS    RATE    F FC PERS MACH  MACH  TOOL  OVERLAP    L/T I/O   DATE

 --- -- ------------------------------ - --- - ----  ---------- - -- ---- ---- ----- ----- ----------  --- --- --------

 010 00 BUILD COMPUTER                 1 WL1 N  1.0       .5000       2.0   .0

 015 00 OUTSIDE PAINTING OPERATION       950                                                             5 IN   2/01/92

 020 00 INSPECT COMPUTER               1 WL1 N   .0       .2000       1.0   .0

Purpose

The Reference Manufacturing Routing Report provides a list of all operations required to manufacture the requested parent part.

Report Sequence

Operation Number within Plant and Parent Part Number.