WILLIAMS JUST-IN-TIME 2/19/95
DSP01 FLOW INTERVAL GENERATION DETAIL
CALENDAR 02
Period Period Period Period Period Period Period Period
No Date No Date No Date No Date
1 010195 2 011595 3 020195 4 021595
5 030195 6 031595 7 040195 8 041595
9 050195 10 051595 11 060195 12 061595
13 070195 14 071595 15 080195 16 081595
17 090195 18 091595 19 100195 20 101595
21 110195 22 111595 23 120195 24 121595
25 010196 26 27 28
29 30 31 32
33 34 35 36
37 38 39 40
41 42 43 44
45 46 47 48
49 50 51 52
F2=Command F3=Exit F6=Next Screen F11=New Calendar
This screen permits 104 user-defined flow interval end dates to be entered for calendar codes which use this means of defining JIT flow intervals. The plants which use these calendar codes will then have flow authorizations and flow requirements generated with begin and end dates which correspond to the begin and end dates defined here.
CALENDAR CODE
Display only. Identifies the calendar code that was entered by the user on the Function Select screen.
PERIOD NUMBER
Display only. The period number whose end date you will be defining.
PERIOD DATE
Required. The end date for the period which you are defining. The end date for one period helps to define the begin date for the period which follows it.
COMMAND KEYS
Enter - Update file.
F3 - Returns to JIT menu.
F5 - Return to the detail screen where the flow interval end dates for periods 1 to 52 are defined.
F6 - Page forward to the detail screen where the end dates for periods 53 to 104 are defined.
F11 - Allows the user to define a new calendar code for the flow intervals definition desired to be maintained.
F15 - Used to return to enter mode on the detail screen.
F19 - Used to post entered data.
|