MAC-PAC Homecontact ussupport login 
Documentation > MAC-PAC Reference Library > Manufacturing > Just-in-Time > Screens > Daily/Weekly Production Schedule > JT100S01 - Function Select

JT100S01 - Function Select

 

 

WILLIAMS   PLT BEL                JUST-IN-TIME                         6/23/94

 DSP01              DAILY PRODUCTION SCHEDULE MAINTENANCE                SELECT

                                                                                

                                                                               

                                                                               

              Production Center       CNTR01                                   

                                                                               

              Selection Criteria                                               

                Beginning Date        062394                                    

                Ending Date                                                    

                Parts With Demand                                              

                All Relationships                                              

                                                                               

              Calculate Availability  N                                        

                Planned Activity      Y                                         

                                                                               

              Part Addition                                                    

                                                                               

              Initial Family                                                   

                                                                               

                                                                               

 F2=Command          F3=Exit             F4=Prompt           F7=Schedule By Part

 F9=Enter Inquiry    F11=Time-Phased P/A F17=New Plant                         

                                                                                                                                                               

 

This conversation allows you to maintain the planned daily/weekly production quantities for JIT parts within a production center.

This screen allows you to specify the production center for production schedule maintenance, as well as a begin date.  You are allowed to maintain the production scheduled on the begin date and into the future.

PLANT

Required.  Used to identify the plant in which maintenance/inquiry will be done.  The plant must be valid, and you must be authorized to the manufacturing company/warehouse associated with the plant (Reference File category 409).  This field defaults to the plant assigned to your user ID, but may be changed by pressing F17.

PRODUCTION CENTER

Required.  Enter the production center for which production schedule maintenance will be performed.  Depending on the part selection options chosen, the manufacturing or build-through parts ( or transfer parts, if they have BOMs defined in this plant) produced in this production center are displayed on the detail screen.  Only one user may maintain the production schedule for a particular production center at a time.

BEGIN DATE

Required.  Enter the first date on which scheduled production will be displayed for maintenance.  The date entered must be equal to or greater than the system date.  This begin date defaults to the system date if it is not entered.

ENDING DATE

Optional.  This date specifies the ending date for the production schedule displayed on the screen.  This date defaults to the value set on the production center file for the maintenance horizon.

PART SELECTION CRITERIA

Required.  There are two part selection criteria which can be specified.  If no part selection is specified, the parts within the production center specified which have some form of demand on them will be displayed, including those parts that do not have production scheduled for the specified dates.

PARTS WITH DEMAND

Optional.  This field can be selected with an X.  If this is selected, parts within the production center specified which have some form of demand on them will be displayed, including those parts that do not have production scheduled for the specified dates.

ALL RELATIONSHIPS

Optional.  Enter an X in this field to select it.  If you select this field, every part that has a relationship with the production center entered on this screen, will be loaded and displayed on the Detail screen.

CALCULATE AVAILABILITY

Required.  Valid values are:

Y - Calculate and display the availability for the part on the Detail screen.

N - Do not calculate the availability for the part.

This field defaults to N.

PLANNED ACTIVITY

Required (if the Calculate Availability Flag is yes).  Optional (if the Calculate Availability Flag is no).  This field determines which activity should be included in the available quantity calculations.  Manufacturing orders, purchase requisitions, component requirements, and transfer requisitions will be included or excluded from the calculations based on their status and the value of this flag.  Valid values as defined on Reference File category D84 are:

Y - Include firmed, open, and planned manufacturing orders; firmed, released, and planned purchase requisitions; open component requirements; and released and planned transfer requisitions.

R - Include firmed and open manufacturing orders; firmed and released purchase requisitions; open component requirements of open and firmed manufacturing orders; and released transfer requisitions.

N - Include firmed and open manufacturing orders, and open component requirements of open and firmed manufacturing orders.

PART ADDITION

Optional.  This field permits a production schedule to be added in this production center for a part whose default production center on its Part Master Record is different.  The search field permits a JIT production type part to be "pulled in" from a list of parts defined in the plant.  The part must have a part status that is valid for flow authorizations, as defined on the Reference File, category D88.

INITIAL FAMILY

Optional.  Allows all parts with a common Family ID (Reference File category 423) to be displayed on the detail screen.  Permits easy scheduling of related parts produced in the same production center.

COMMAND KEYS

Enter - Process request.

F2    - Display a window where a fast path option or mnemonic can be entered.  Fast path allows the next menu selection to be made directly from this screen.  When the window is displayed, pressing F3 will remove it.

F3    - Exit program and return to menu.  If this screen was accessed from another conversation, pressing F3 will return you to that original conversation.

F4    - Display a list of values for the field where the cursor is positioned.  If you select one of the items from the list, it will be returned to the application screen.

F7    - Enter the Part Production Schedule Maintenance Program.

F9    - Enter the Daily/Weekly Production Schedule Inquiry Program.

F11   - Enter the Time Phased Part Availability Inquiry Program.

F17   - Change the plant in which the user is currently working.