Documentation >
MAC-PAC Reference Library >
Manufacturing >
Just-in-Time >
Reports >
Scrap Expense Detail Report
Scrap Expense Detail Report
JT530A
DATE 2/29/92 PENNSKY MANUFACTURING COMPANY PAGE 1
TIME 15:11:22 CO 001
REPORT JT530A LOC 001
JIT SCRAP EXPENSE DETAIL PLANT MFG
FROM 1/01/91 TO 2/28/92 REQUESTOR:
WILLIAMS
PRODUCT FAMILY : JT1 JT PROD CENTER FAMILY 1
PRODUCTION CENTER:
: JTPC1A JT PROD CTR A IN FAM 1
REASON SCRAP
PART NUMBER PART DESCRIPTION CODE REASON DESCRIPTION QUANTITY MATERIAL EXPENSE
--------------- -------------------- ---- ------------------------- ------------ ------------------
JTPART1A2 JT PART 2 - PC 1A 01 DEFECTIVE MATERIAL 25.000 .00
PART TOTALS : JTPART1A2 25.000 .00
JTPART2A2 JT PART 2 - PC 2A 01 DEFECTIVE MATERIAL 50.000 .00
PART TOTALS : JTPART2A2 50.000 .00
|
Purpose
This report lists all scrap transactions that meet the criteria entered by the user when the report was requested. The criteria are printed at the top of the report. (The report is requested on the JIT Scrap Expense Report Request screen, JT310S02.) The records are retrieved from the JIT Scrap Transaction File (JT170BP1), which contains one record for each scrap transaction entered through the JIT Unplanned Material Usage conversation. Report subtotals are provided for each part, production center, product family, plant, and company.
Report Sequence
Company, plant, product family, production center, part