MAC-PAC Homecontact ussupport login 
Documentation > MAC-PAC Reference Library > Manufacturing > Just-in-Time > Reports > Production Schedule with Availability/Load Calculation Report

Production Schedule with Availability/Load Calculation Report

JT525A

 

 

Production Schedule with Availability/Load Calculation Report (JT525A) - Daily Production

 

DATE        3/11/93                          STEVENS ART SUPPLY                                                           PAGE    1

TIME       12:27:57                          BELGIUM MANUFACTURING WHS.                                                  PLANT  BEL

REPORT     JT525A

REQUESTOR  MLB                                         PRODUCTION SCHEDULE

PRODUCTION CENTER     MOLDING    MOLDING FRAMES               CAPACITY     1000.000 DZ      SCHEDULE PERIOD   3/11/93 -  3/24/93

REPORT SELECTION CRITERIA:  ** PARTS WITH DEMAND **                                         QUANTITIES BY UNIT

PART NUMBER/      FIRM   M UM/    CONT QTY/  OVR/UND    : D A I L Y  P R O D U C T I O N /    A V A I L A B I L I T Y : REMAINING

DESCRIPTION       DATE   B RECEIVG  ISSUING    BAL      :   3/11/93     3/12/93     3/15/93     3/16/93     3/17/93   : IN PERIOD

--------------- -------- - --    ---------- ----------  : ----------  ----------  ----------  ----------  ----------  : ----------

JTPARENT                   EA        10.000      1.000  :                                                             :

JIT PARENT                 ALOCAT1  *PARENT    136.000  :    136.000     136.000     136.000     136.000     136.000  :

                                                        :                                                             :

JTPR01          12/03/92   KG          .000    100.000- :    100.000     100.000     100.000     100.000     200.000  :    800.000

JIT-PR                     *ENTRY*  *PARENT    441.000  :    541.000     641.000     741.000     841.000    1041.000  :

                                                        :                                                             :

JTPR02          12/03/92   KG          .000             :                                                             :

JT-PR2                     *ENTRY*  *PARENT   2163.500- :   2713.500-   3263.500-   3813.500-   4363.500-   6563.500- :   4400.000-

                                                        :                                                             :

MFJIT                      EA          .000    869.566- :                                                             :

MF JIT                              *PARENT    869.566  :    869.566     869.566     869.566     869.566     869.566  :

                                                        :                                                             :

MFJIT2                     EA          .000             :                                                             :

MF JIT2                             *PARENT   4110.000- :   4110.000-   4110.000-   4110.000-   4110.000-   4110.000- :   1000.000-

                                                        :                                                             :

MFJIT3                     EA         1.000   4010.000- :                                                             :   1000.000

MF JIT3                             *PARENT   4010.000  :   4010.000    4010.000    4010.000    4010.000    4010.000  :

                                                        :                                                             :

MFJITRP2                   EA         1.000    810.000- :                                                             :

MF JITRP2                           *PARENT    810.000  :    810.000     810.000     810.000     810.000     810.000  :

                                                        :                                                             :

MFJITRP3                   EA         1.000   4900.000- :                                                             :   1000.000

MF JITRP3                           *PARENT    890.000  :    890.000     890.000     890.000     890.000     890.000  :   1000.000-

                                                        :                                                             :

SAJIT                      EA         5.000    380.000- :                                                             :

SAJITPART                  R1BIN01  *PARENT    800.000  :    800.000     800.000     800.000     800.000     800.000  :

                                                        :                                                             :

SAJIT3                   Y EA         1.000    746.000- :                                                             :

SAJITPART3                 R1BIN01  R1BIN01     10.000- :     10.000-     10.000-     10.000-     10.000-     10.000- :

                                                        :                                                             :

JITT                       01          .000   2000.000- :                                                             :

JIT-T                      LOCA01   LOCA01    2200.000  :   2200.000    2200.000    2200.000    2200.000    2200.000  :

                                                        :                                                             :

JITT2                      01          .000    135.000- :                                                             :

JIT-T2                                         135.000  :    135.000     135.000     135.000     135.000     135.000  :

                                                        :                                                             :

                         P/C TOTAL LOAD       1000.000  :   1000.000    1000.000    1000.000    1000.000    2000.000  :   8000.000

                         PERCENT OF CAPACITY       100  :        100         100         100         100         200  :        160

Production Schedule with Availability/Load Calculation Report (JT525A) - Weekly Production

 

DATE        3/11/93                          STEVENS ART SUPPLY                                                           PAGE    1

TIME       13:30:38                          BELGIUM MANUFACTURING WHS.                                                  PLANT  BEL

REPORT     JT525A

REQUESTOR  WILLIAMS                                    PRODUCTION SCHEDULE

PRODUCTION CENTER     MOLDING    MOLDING FRAMES               CAPACITY     1000.000 DZ      SCHEDULE PERIOD   3/11/93 -  4/09/93

REPORT SELECTION CRITERIA:  ** PARTS WITH DEMAND **                                         QUANTITIES BY UNIT

PART NUMBER/      FIRM   M UM/    CONT QTY/  OVR/UND    : W E E K L Y  P R O D U C T I O N /  A V A I L A B I L I T Y

DESCRIPTION       DATE   B RECEIVG  ISSUING    BAL      :   3/11/93     3/15/93     3/22/93     3/29/93     4/05/93

--------------- -------- - --    ---------- ----------  : ----------  ----------  ----------  ----------  ----------

JTPARENT                   EA        10.000      1.000  :

JIT PARENT                 ALOCAT1  *PARENT    136.000  :    136.000     136.000     136.000     136.000     136.000

                                                        :

JTPR01          12/03/92   KG          .000    100.000- :    200.000     800.000     400.000

JIT-PR                     *ENTRY*  *PARENT    441.000  :    641.000    1441.000    1841.000    1841.000    1841.000

                                                        :

JTPR02          12/03/92   KG          .000             :

JT-PR2                     *ENTRY*  *PARENT   2163.500- :   3263.500-   7663.500-   9863.500-   9863.500-   9863.500-

                                                        :

MFJIT                      EA          .000    869.566- :                                       1130.434

MF JIT                              *PARENT    869.566  :    869.566     869.566     869.566    2000.000    2000.000

                                                        :

MFJIT2                     EA         1.000   4010.000- :                           1000.000    1000.000    1000.000

MF JIT2                             *PARENT   4010.000  :   4010.000    4010.000    5010.000    6010.000    7010.000

                                                        :

MFJIT3                     EA         1.000    810.000- :

MF JIT3                             *PARENT    810.000  :    810.000     810.000     810.000     810.000     810.000

                                                        :

MFJITRP2                   EA         1.000   4900.000- :                           1000.000    1000.000    1000.000

MF JITRP2                           *PARENT    890.000  :    890.000     890.000     890.000     890.000     890.000

                                                        :

MFJITRP3                   EA         5.000    380.000- :

MF JITRP3                  R1BIN01  *PARENT    800.000  :    800.000     800.000     800.000     800.000     800.000

                                                        :

SAJITPART                Y EA         1.000    746.000- :

SA JIT                     R1BIN01  R1BIN01     10.000- :     10.000-     10.000-     10.000-     10.000-     10.000-

                                                        :

JITT                       01          .000   2000.000- :

JIT-T                      LOCA01   LOCA01    2200.000  :   2200.000    2200.000    2200.000    2200.000    2200.000

                                                        :

JITT2                      01          .000    135.000- :

JIT-T2                                         135.000  :    135.000     135.000     135.000     135.000     135.000

                                                        :

                         P/C TOTAL LOAD       1000.000  :   2000.000    8000.000    4000.000        .000        .000

                         PERCENT OF CAPACITY       100  :        100         160          80           0           0

                                                  **  END OF PRODUCTION CENTER  **

                                                       **  END OF REPORT  **

Purpose

The Production Schedule with Availability/Load Calculation Report (JT525A) displays the projected inventory (availability) for each part in a production center within a plant, and the production that is over or under schedule.  The report also displays the production center's total load and the percentage of capacity. 

If the period that you request to be analyzed is greater than one week, the sum of the percentage of total load for the subsequent week(s) appears under the column "Remaining in Period."  The percentage of capacity for this period is also determined. 

Production quantities may be expressed in terms of the number of containers.  Incomplete containers are rounded up to the next number. 

You may request the report to generate data for one production center, for the production centers of a production center family, or all the production centers within a plant.  You may also request only parts that have production scheduled, parts that have a relationship with the production center; or parts of a specific part family.

This report is generated by accessing the Production Schedule Report Request option on the Just-in-Time menu. 

Report Sequence

Plant, production center, parent part