Production Schedule with Availability/Load Calculation Report
JT525A
Production Schedule with Availability/Load Calculation Report (JT525A) - Daily Production
DATE 3/11/93 STEVENS ART SUPPLY PAGE 1
TIME 12:27:57 BELGIUM MANUFACTURING WHS. PLANT BEL
REPORT JT525A
REQUESTOR MLB PRODUCTION SCHEDULE
PRODUCTION CENTER MOLDING MOLDING FRAMES CAPACITY 1000.000 DZ SCHEDULE PERIOD 3/11/93 - 3/24/93
REPORT SELECTION CRITERIA: ** PARTS WITH DEMAND ** QUANTITIES BY UNIT
PART NUMBER/ FIRM M UM/ CONT QTY/ OVR/UND : D A I L Y P R O D U C T I O N / A V A I L A B I L I T Y : REMAINING
DESCRIPTION DATE B RECEIVG ISSUING BAL : 3/11/93 3/12/93 3/15/93 3/16/93 3/17/93 : IN PERIOD
--------------- -------- - -- ---------- ---------- : ---------- ---------- ---------- ---------- ---------- : ----------
JTPARENT EA 10.000 1.000 : :
JIT PARENT ALOCAT1 *PARENT 136.000 : 136.000 136.000 136.000 136.000 136.000 :
: :
JTPR01 12/03/92 KG .000 100.000- : 100.000 100.000 100.000 100.000 200.000 : 800.000
JIT-PR *ENTRY* *PARENT 441.000 : 541.000 641.000 741.000 841.000 1041.000 :
: :
JTPR02 12/03/92 KG .000 : :
JT-PR2 *ENTRY* *PARENT 2163.500- : 2713.500- 3263.500- 3813.500- 4363.500- 6563.500- : 4400.000-
: :
MFJIT EA .000 869.566- : :
MF JIT *PARENT 869.566 : 869.566 869.566 869.566 869.566 869.566 :
: :
MFJIT2 EA .000 : :
MF JIT2 *PARENT 4110.000- : 4110.000- 4110.000- 4110.000- 4110.000- 4110.000- : 1000.000-
: :
MFJIT3 EA 1.000 4010.000- : : 1000.000
MF JIT3 *PARENT 4010.000 : 4010.000 4010.000 4010.000 4010.000 4010.000 :
: :
MFJITRP2 EA 1.000 810.000- : :
MF JITRP2 *PARENT 810.000 : 810.000 810.000 810.000 810.000 810.000 :
: :
MFJITRP3 EA 1.000 4900.000- : : 1000.000
MF JITRP3 *PARENT 890.000 : 890.000 890.000 890.000 890.000 890.000 : 1000.000-
: :
SAJIT EA 5.000 380.000- : :
SAJITPART R1BIN01 *PARENT 800.000 : 800.000 800.000 800.000 800.000 800.000 :
: :
SAJIT3 Y EA 1.000 746.000- : :
SAJITPART3 R1BIN01 R1BIN01 10.000- : 10.000- 10.000- 10.000- 10.000- 10.000- :
: :
JITT 01 .000 2000.000- : :
JIT-T LOCA01 LOCA01 2200.000 : 2200.000 2200.000 2200.000 2200.000 2200.000 :
: :
JITT2 01 .000 135.000- : :
JIT-T2 135.000 : 135.000 135.000 135.000 135.000 135.000 :
: :
P/C TOTAL LOAD 1000.000 : 1000.000 1000.000 1000.000 1000.000 2000.000 : 8000.000
PERCENT OF CAPACITY 100 : 100 100 100 100 200 : 160
|
Production Schedule with Availability/Load Calculation Report (JT525A) - Weekly Production
DATE 3/11/93 STEVENS ART SUPPLY PAGE 1
TIME 13:30:38 BELGIUM MANUFACTURING WHS. PLANT BEL
REPORT JT525A
REQUESTOR WILLIAMS PRODUCTION SCHEDULE
PRODUCTION CENTER MOLDING MOLDING FRAMES CAPACITY 1000.000 DZ SCHEDULE PERIOD 3/11/93 - 4/09/93
REPORT SELECTION CRITERIA: ** PARTS WITH DEMAND ** QUANTITIES BY UNIT
PART NUMBER/ FIRM M UM/ CONT QTY/ OVR/UND : W E E K L Y P R O D U C T I O N / A V A I L A B I L I T Y
DESCRIPTION DATE B RECEIVG ISSUING BAL : 3/11/93 3/15/93 3/22/93 3/29/93 4/05/93
--------------- -------- - -- ---------- ---------- : ---------- ---------- ---------- ---------- ----------
JTPARENT EA 10.000 1.000 :
JIT PARENT ALOCAT1 *PARENT 136.000 : 136.000 136.000 136.000 136.000 136.000
:
JTPR01 12/03/92 KG .000 100.000- : 200.000 800.000 400.000
JIT-PR *ENTRY* *PARENT 441.000 : 641.000 1441.000 1841.000 1841.000 1841.000
:
JTPR02 12/03/92 KG .000 :
JT-PR2 *ENTRY* *PARENT 2163.500- : 3263.500- 7663.500- 9863.500- 9863.500- 9863.500-
:
MFJIT EA .000 869.566- : 1130.434
MF JIT *PARENT 869.566 : 869.566 869.566 869.566 2000.000 2000.000
:
MFJIT2 EA 1.000 4010.000- : 1000.000 1000.000 1000.000
MF JIT2 *PARENT 4010.000 : 4010.000 4010.000 5010.000 6010.000 7010.000
:
MFJIT3 EA 1.000 810.000- :
MF JIT3 *PARENT 810.000 : 810.000 810.000 810.000 810.000 810.000
:
MFJITRP2 EA 1.000 4900.000- : 1000.000 1000.000 1000.000
MF JITRP2 *PARENT 890.000 : 890.000 890.000 890.000 890.000 890.000
:
MFJITRP3 EA 5.000 380.000- :
MF JITRP3 R1BIN01 *PARENT 800.000 : 800.000 800.000 800.000 800.000 800.000
:
SAJITPART Y EA 1.000 746.000- :
SA JIT R1BIN01 R1BIN01 10.000- : 10.000- 10.000- 10.000- 10.000- 10.000-
:
JITT 01 .000 2000.000- :
JIT-T LOCA01 LOCA01 2200.000 : 2200.000 2200.000 2200.000 2200.000 2200.000
:
JITT2 01 .000 135.000- :
JIT-T2 135.000 : 135.000 135.000 135.000 135.000 135.000
:
P/C TOTAL LOAD 1000.000 : 2000.000 8000.000 4000.000 .000 .000
PERCENT OF CAPACITY 100 : 100 160 80 0 0
** END OF PRODUCTION CENTER **
** END OF REPORT **
|
Purpose
The Production Schedule with Availability/Load Calculation Report (JT525A) displays the projected inventory (availability) for each part in a production center within a plant, and the production that is over or under schedule. The report also displays the production center's total load and the percentage of capacity.
If the period that you request to be analyzed is greater than one week, the sum of the percentage of total load for the subsequent week(s) appears under the column "Remaining in Period." The percentage of capacity for this period is also determined.
Production quantities may be expressed in terms of the number of containers. Incomplete containers are rounded up to the next number.
You may request the report to generate data for one production center, for the production centers of a production center family, or all the production centers within a plant. You may also request only parts that have production scheduled, parts that have a relationship with the production center; or parts of a specific part family.
This report is generated by accessing the Production Schedule Report Request option on the Just-in-Time menu.
Report Sequence
Plant, production center, parent part