Production Schedule Availability/Load Calculation Report Request Exceptions
Production Schedule Availability/Load Calculation Report Request Exceptions
JT525B
DATE 12/18/92 STEVENS ART SUPPLY PAGE 1
TIME 16:50:34 RUE DE GRAND CHIEN 1 PLANT BEL
REPORT JT525B
REQUESTOR WILLIAMS PRODUCTION SCHEDULE
AVAILABILITY / LOAD CALCULATION
REPORT REQUEST EXCEPTIONS
PRODUCTION CENTER APC-2
REPORT SELECTION CRITERIA: ** PARTS WITH DEMAND **
FAMILY SA
DAILY PRODUCTION SCHEDULE REPORT
PERIOD START DATE 12/21/92
NUMBER OF WEEKS
BAR CODE NOT USED
QUANTITIES BY UNIT
-------------------------- - ERROR ---------------------------
PROD CTR PART NUMBER CODE MESSAGE
------- ----------------- ------- -------------------------------------------------------
APC-2 MPC3820 No parts selected for given criteria
** END OF REPORT **
|
Purpose
The Production Schedule Availability/Load Calculation Report Request Exceptions Report (JT525B) provides a list of all retrieval requests within a plant that have errors, along with their error codes and messages. This report is printed when errors are found in processing the retrieval request for the plant.
Report Sequence
Plant