MAC-PAC Homecontact ussupport login 
Documentation > MAC-PAC Reference Library > Manufacturing > Inventory Control > Reports > Manufacturing Order/Requirements Delete

Manufacturing Order/Requirements Delete

IC060B

 


 

DATE     3/02/93                              ACME MANUFACTURING COMPANY                                                  PAGE     1

TIME    18:47:57

REPORT  IC-060B

                                          MANUFACTURING ORDER / REQUIREMENTS DELETE REPORT

                                                       HORIZON DATE:   2/02/93

 PARENT            ORDER     TOTAL      -----------------------------------------COMPONENT------------------------------------------

 PART NUMBER        NO      QTY RCVD    PART NUMBER     QTY ISSUE       PART NUMBER     QTY ISSUE       PART NUMBER     QTY ISSUE

 ---------------  -------  ----------   --------------- ------------    --------------- ------------    --------------- ------------

 SR-100           M000001      10 000   ARM-001                  000    FLAT BIT                 000    GLUE                     000

                                            -------------------------------------  LABOR  -------------------------------------

                                             OPER     CM     QUANTITY     OPER     CM     QUANTITY     OPER     CM     QUANTITY

                                            NO  LN    NO     COMPLETE    NO  LN    NO     COMPLETE    NO  LN    NO     COMPLETE

                                            --- --    --    ---------    --- --    --    ---------    --- --    --    ---------

                                            010 00    00            0    010 00    10            0    010 00    20            0

                                                                                                             ** END OF REPORT **

Purpose

The Manufacturing Order/Requirements Delete Report lists all records physically deleted from the Manufacturing Order, Component Requirements, and Labor Requirements Files during execution of the Order/Requirements Purge Program.  The report horizon date indicates the date specified by the user when the Order/Requirements Purge Program was initiated.  The horizon date is the last date on which a record will be deleted.  A manufacturing order record is deleted if its date of last activity and close date are earlier than the user-defined horizon date.

Report Sequence

Parent Part Number, Order Number, Component Part Number.