Documentation >
MAC-PAC Reference Library >
Manufacturing >
Inventory Control >
Reports >
Manufacturing Order/Requirements Delete
Manufacturing Order/Requirements Delete
IC060B
DATE 3/02/93 ACME MANUFACTURING COMPANY PAGE 1
TIME 18:47:57
REPORT IC-060B
MANUFACTURING ORDER / REQUIREMENTS DELETE REPORT
HORIZON DATE: 2/02/93
PARENT ORDER TOTAL -----------------------------------------COMPONENT------------------------------------------
PART NUMBER NO QTY RCVD PART NUMBER QTY ISSUE PART NUMBER QTY ISSUE PART NUMBER QTY ISSUE
--------------- ------- ---------- --------------- ------------ --------------- ------------ --------------- ------------
SR-100 M000001 10 000 ARM-001 000 FLAT BIT 000 GLUE 000
------------------------------------- LABOR -------------------------------------
OPER CM QUANTITY OPER CM QUANTITY OPER CM QUANTITY
NO LN NO COMPLETE NO LN NO COMPLETE NO LN NO COMPLETE
--- -- -- --------- --- -- -- --------- --- -- -- ---------
010 00 00 0 010 00 10 0 010 00 20 0
** END OF REPORT **
|
Purpose
The Manufacturing Order/Requirements Delete Report lists all records physically deleted from the Manufacturing Order, Component Requirements, and Labor Requirements Files during execution of the Order/Requirements Purge Program. The report horizon date indicates the date specified by the user when the Order/Requirements Purge Program was initiated. The horizon date is the last date on which a record will be deleted. A manufacturing order record is deleted if its date of last activity and close date are earlier than the user-defined horizon date.
Report Sequence
Parent Part Number, Order Number, Component Part Number.