Documentation >
MAC-PAC Reference Library >
Manufacturing >
Inventory Control >
Key Concepts and Procedures >
Potency >
Creating a Potency-Controlled Environment
Creating a Potency-Controlled Environment
Before a potency-controlled part can be manufactured, you must make the environment potency controlled. To do so:
· Set the Lot Control option on the System Control Menu to Y (yes)
· Set the Potency Control option on the System Control Menu to Y (yes)
Only lot-controlled or lot-assignable items may be potency controlled. By setting these two options to Y, potency fields will be displayed on various screens throughout MAC-PAC.
Unlike the Lot Control option, you may switch the Potency Control option to yes or no whenever you wish¾thereby making your environment potency controlled or non-potency controlled, depending on the value of the option.