WILLIAMS   PLT MFG            DESIGN ENGINEERING                USD    3/02/95

 DSP01                           PART COST INQUIRY                       DETAIL

                                                                               

    Part Number      RADIO           MOTORCYCLE RADIO           UOM EA         

                                                                               

  Curr Rollover Code    N                 Std Cost Rollup Code  N              

  Sim Rollover Code     N                 Average Order Qty          1.000     

  Curr Labor-This Level        .0000000   Curr OH-This Level           .0000000

  Std Labor-This Level         .0000000   Std OH-This Level            .0000000

                                                                               

 Cst                               Current         Standard       Acq   Cst    

 Cde     Cost Description           Cost             Cost         Cst   Typ    

 MAT                               250.0000000      250.0000000    Y    M      

                                                                               

                                                                               

                                                                               

                                                                               

                                                                               

                                                                               

                                                                               

                                                                               

 F2=Command          F3=Exit             F9=Maintenance      F10=Select        

                                                                               

                                                                               

 

 

This screen is used to display detailed cost elements, cost rollover and update selection flags, average order quantity, and labor and overhead costs.

PLANT

Display only.  The plant where the displayed costs are in effect.

BASE CURRENCY

Display only.  The base currency for the manufacturing warehouse of the selected plant, as defined for the company/location associated with the manufacturing warehouse.  Appears in the upper right corner of the screen, just to the left of the date field.  The company/location associated with the manufacturing company/ware- will need to be defined.  Type an 'X' and press F11 for extended text regarding currency codes.

PART NUMBER

Display only.  The item whose costs are displayed.

STOCKKEEPING UNIT OF MEASURE

Display only.  The stockkeeping unit of measure for the item.

COST ROLLOVER CODE

Display only.  Allows you to 'roll' current costs into standard costs for selected parts only.  The standard cost rollover process is requested in the Product Costing module, and may be performed for all parts or for selected parts only.  Valid values are:

Y - The standard costs for the part will be updated with current costs if a selective standard cost rollover is performed.

N - Standard costs for the part will not be affected by a selective standard cost rollover.

STANDARD COST ROLLUP

Display only.  Allows you to re-generate standard costs for selected parts only.  Valid values are:

Y - Standard costs will be recalculated if a selective standard cost generation is performed.

N - Standard costs will not be recalculated if a selective standard cost generation is performed.

SIMULATED ROLLOVER CODE

Display only.  Allows you to 'roll' simulated costs into current or standard cost for selected parts only.  The cost rollover process is requested in the Product Costing module, and may be performed for all parts or for selected parts only.  Valid values are:

Y - The simulated costs for the part will be rolled into either the current or standard cost values when a selective simulated cost rollover is performed.

N - Costs for the part will not be modified by a selective simulated cost rollover.

AVERAGE ORDER QUANTITY

Required.  This field represents the typical quantity made when an item is manufactured.  Product Costing uses the Average Order Quantity and the Batch Quantity to calculate the Number of Batches for a fixed time operations with a batch sensitivity equal to yes.

Number of Batches = (Qty. Required - (Sensitivity Factor X Batch Quantity))/Batch Quantity

The Number of Batches is then used to calculate labor and overhead costs.

CURRENT LABOR - THIS LEVEL

Optional.  The labor cost currently required to make this level of the product (excluding labor incurred in manufacturing the item's components).  This value will not be used to value inventory.  It can be used to track fluctuations in cost.  If Product Costing is installed, you can roll this value into the standard cost field.  If the Curr Rollover Code field = Y, this cost will be rolled over into the standard cost during a selective cost rollover.

This field is displayed only if:

o  Neither Product Costing nor Manufacturing Engineering is installed.

o  The part is a JIT part and either ME is not installed or you choose not to use the part routing to generate labor costs.  In these situations, MAC-PAC cannot calculate labor costs automatically.

CURRENT OVERHEAD - THIS LEVEL

Optional.  The overhead currently required to make this level of the product (excluding overhead incurred in manufacturing the product's components).  This value will not be used to value inventory; it can be used to track fluctuations in cost.  If Product Costing is installed, you can roll this value into the standard cost field.  If the Curr Rollover Code field = Y, this cost will be rolled over to the standard cost during a selective cost rollover.

This field is displayed only if Product Costing is installed but Manufacturing Engineering is not installed.  In this situation, overhead costs cannot be calculated automatically.

STANDARD LABOR COST - THIS LEVEL

Optional.  The standard labor required to make this level of the product (excluding labor incurred in manufacturing the product's components).  The value in this field will be used to value inventory for the part.

This field is only displayed if:

o  Neither Product Costing nor Manufacturing Engineering is installed.

o  The part is a JIT part and either ME is not installed or you choose not to use the part routing to generate labor costs.  In these situations, MAC-PAC cannot calculate labor costs automatically.

STANDARD OVERHEAD COST - THIS LEVEL

Optional.  The standard overhead required to make this level of the product (excluding overhead incurred in manufacturing the product's components).  The value in this field will be used to value inventory.

This field is displayed only if Product Costing is installed but Manufacturing Engineering is not installed.  In this situation, overhead costs cannot be calculated automatically.

COST CODE

Display only.  The cost element associated with the cost.  Cost elements provide detailed breakdowns in the total cost of a part.  Cost elements are defined on Reference File Category C17.

DESCRIPTION

Display only.  The description associated with the cost element.

CURRENT COST

Display only.  The cost per unit for the cost element.

STANDARD COST

Display only.  The cost per unit for the element identified in the Cost Code field.

ACQUISITION FLAG

Display only.  Indicates whether the cost is paid to the vendor, if the part is typically purchased, or to another warehouse, if the part is typically transferred in from another warehouse.  The sum of all Acquisition Costs will be included in the calculation of Purchase Price Variance and Transfer Price Variance.  Non-acquisition costs should represent add-on charges such as freight, duty and inspection and handling costs.  These figures will not be included in the calculation of variances.

COST TYPE

Display only.  Indicates whether the cost should be rolled up into the material, labor or overhead bucket.  Cost elements will be rolled up into separate cost element buckets in addition to the material, labor and overhead totals.  Cost elements may optionally be rolled into summary buckets, as defined on Reference File Category C17.  Cost types are blank for manufactured parts.

COMMAND KEYS

Enter - Return to the Function Select screen.

F2    - Display a window where a fast path option or mnemonic can be entered.  Fast path allows the next menu selection to be made directly from this screen.  When the window is displayed, pressing F3 will remove it.

F3    - Exit program and return to menu.

F9    - Enter the Part Costs Maintenance conversation.

F10   - Return to the Function Select screen.