DE520

 


 

DATE    3/09/93                                 STEVENS ART SUPPLY                                                        PAGE     2

TIME   17:07:43                                                                                                          PLANT   BEL

REPORT DE-520                                                                                         REQUESTOR JRC

                                                       PENDING ENGINEERING CHANGES

                                                      CHANGES DUE  3/09/93 TO 12/31/93                                  PLANNER  AAA

----------------  PARENT  --------------- ------------------------------------------- COMPONENT   ---------------------------------

                                          ----- EFFECTIVITY -----                                                   PRT      QTY

PART NUMBER     PART DESCRIPTION          I/O   DATE      ECO     REV PART NUMBER PART DESCRIPTION                  TYP UM   PER

--------------- ------------------------- --- -------- ---------- --- --- --------------- ----------------------------- -- --------

BIKETIRE        BIKE TIRE                 OUT 12/30/93 ECO1029384 000 400 NOZZLE          BIKE TIRE NOZZLE          PUR EA       1.

                                          OUT 12/30/93 ECO2938475 000 500 SPOKE           BIKE TIRE SPOKE           PUR EA       1.

Purpose

The Pending Product Change Report provides a list of all parent parts and their associated component parts that are pending a product change during a specified period.  This report is printed upon request.  A message is printed when no product changes are to take effect during the period.

Report Sequence

Component Part Number within Product Change Order Number within specified Effectivity Date within Parent Part Number.