Cumulative Leadtime Generation Report

DE580A

 

DATE    6/07/94                              ANDERSEN CONSULTING APPLICATIONS, INC                                      PAGE      1

TIME   16:57:55                                                                                                        PLANT    BEL

REPORT DE580A                                 CUMULATIVE LEADTIME GENERATION REPORT                REQUESTOR   WILLIAMS

                                                  EFFECTIVITY DATE   6/07/94

                                                PART      PREVIOUS         NEW          PREV RP FIRM    NEW RP FIRM

PART NUMBER        PART DESCRIPTION             TYPE    CUM LEADTIME    CUM LEADTIME    HORIZON DAYS    HORIZON DAYS

---------------    -------------------------    ----    ------------    ------------    ------------    ------------

BOLT-100           PURCHASING PART              MFG          52              64

ASPIRIN            ASPIRIN TABLETS              MFG           0               2

BIKETIRE           BIKETIRE                     MFG          46             223

                                                        ** END OF REPORT **

Purpose

The Cumulative Leadtime Generation Report is created when cumulative leadtimes and/or Requirements Planning firm horizon days are recalculated and updated for a plant.  If 'Y' is entered in the Generate Cumulative Leadtime field on the Cumulative Leadtime Generation Request screen (DE580S01), then the cumulative leadtime is calculated and updated for every part in the plant.  If 'Y' is entered for the Update Requirements Planning Firm Horizon Days, then the Part Master RP Firm Horizon Days will be calculated as being the same days as the cumulative leadtime days/horizon for the part.  All parts within the plant are processed.  The report lists all parts in the plant where the newly calculated cumulative leadtime is different than the leadtime previously stored on the Part Master File. 

Report Sequence

Part Number.