Cumulative Leadtime Generation Report
DE580A
DATE 6/07/94 ANDERSEN CONSULTING APPLICATIONS, INC PAGE 1
TIME 16:57:55 PLANT BEL
REPORT DE580A CUMULATIVE LEADTIME GENERATION REPORT REQUESTOR WILLIAMS
EFFECTIVITY DATE 6/07/94
PART PREVIOUS NEW PREV RP FIRM NEW RP FIRM
PART NUMBER PART DESCRIPTION TYPE CUM LEADTIME CUM LEADTIME HORIZON DAYS HORIZON DAYS
--------------- ------------------------- ---- ------------ ------------ ------------ ------------
BOLT-100 PURCHASING PART MFG 52 64
ASPIRIN ASPIRIN TABLETS MFG 0 2
BIKETIRE BIKETIRE MFG 46 223
** END OF REPORT **
|
Purpose
The Cumulative Leadtime Generation Report is created when cumulative leadtimes and/or Requirements Planning firm horizon days are recalculated and updated for a plant. If 'Y' is entered in the Generate Cumulative Leadtime field on the Cumulative Leadtime Generation Request screen (DE580S01), then the cumulative leadtime is calculated and updated for every part in the plant. If 'Y' is entered for the Update Requirements Planning Firm Horizon Days, then the Part Master RP Firm Horizon Days will be calculated as being the same days as the cumulative leadtime days/horizon for the part. All parts within the plant are processed. The report lists all parts in the plant where the newly calculated cumulative leadtime is different than the leadtime previously stored on the Part Master File.
Report Sequence
Part Number.