Documentation >
MAC-PAC Reference Library >
Manufacturing >
Design Engineering >
Key Concepts and Procedures >
Potency >
Objects not Affected by the Potency Beginning Balance Calculations
Objects not Affected by the Potency Beginning Balance Calculations
The following programs, reports, and inquiries are not affected by the potency beginning balance calculation:
RP500E - Projected Cost Inventory Summary
Costs are based upon standard (stockkeeping) units of measure.
IC540E/IC550E - Order Shortage Reports
All quantity calculations are based on standard (stockkeeping) units of measure.
IC890E - Order Shortage Inquiry
Balances reflect standard (stockkeeping) units of measure.
IC530A - Warehouse Stock Status Summary
Balances reflect standard (stockkeeping) units of measure.
JIT Production Schedule Inquiries/Reports
Availability quantity calculation is based on standard (stockkeeping) units of measure.